Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-Finance | ₹20.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹25.2 L+₹5.2 L (26.2%)Rejected-Finance | ₹25.2 L+₹5.2 L (26.2%) | L2 | Rejected-Finance L2 |
Tender Value
₹16.0 L
EMD Value
₹47,994
Closing Date
2 Apr 2025, 11:00 amClosed
AGM EE
Calicut International Airport Karipur Malappuram Kerala 673647
Control and Monitoring of Runway Lead in Lights at Calicut International Airport
2025_AAI_228225_1
AAI/CL/EE/263/NIT-16/24-25
Open Tender
Electrical Works
Works
90 days
Calicut International Airport
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,120
₹47,994
23 Apr 2025
4 Mar 2025
3 Apr 2025
5 Mar 2025
2 Apr 2025
5 Mar 2025
5 Mar 2025 - 12 Mar 2025
Amount
SH-1 :-SITC OF RLIL Design, supply, installation, testing and commissioning of facility for control and monitoring of runway lead in lights through wireless communication and also to make the Runway Lead-in Lights work in sequence leading to the runway in-use.
Supply of 2 pair 0.5 sq.mm armoured RS 485 communication cable suitable for communication between inverters as per technical specifications.
Laying of 2 pair armored RS 485 cable in the existing surface/ cable tray complete as required including providing necessary connectors for connecting at the inverter side.
SH-II: AICMC of RLIL All-inclusive comprehensive maintenance of complete RLIL control system & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. First Year (after Completion of one year DLP) (5% of Item No.1)
SH-II: AICMC of RLIL All-inclusive comprehensive maintenance of complete RLIL control system & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. Second Year (after Completion of one year DLP) (5% escalation on first year cost of item No. 4)
SH-II: AICMC of RLIL All-inclusive comprehensive maintenance of complete RLIL control system & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. Third Year (after Completion of one year DLP) (5% escalation on second year cost of item No. 5)
SH-II: AICMC of RLIL All-inclusive comprehensive maintenance of complete RLIL control system & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. Fourth Year (after Completion of one year DLP) (5% escalation on third year cost of item No. 6)
SH-II: AICMC of RLIL All-inclusive comprehensive maintenance of complete RLIL control system & other related hardwares and softwares including all spares and consumables, providing full support during breakdown & trouble shooting, programming, carrying out quarterly routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts. Fifth Year (after Completion of one year DLP) (5% escalation on fourth year cost of item No. 7)
Cupinntech Private Limited (BID ID -836282)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .