Tender Value
₹31.9 Cr
EMD Value
₹63.9 L
Closing Date
9 Sept 2026, 3:00 pm
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Chakberia Bhojerhat via Tardah Rd. A. 0.00 to 4.55 Km, Strength. Work and B. 4.55 to 10.69 Km Excl. ICBP Portion of 0.34 Km, Strength. Work incl. reconst. of Culverts, Protective Work and Surface Drain Work, South 24 Pgs Hwy Divn. in dist. 24 Pgs(S)
2026_WBPWD_5019039_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-02 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
270 days
Bhojerhat
Please refer Tender documents.
5 documents required · 5 mandatory
₹63.9 L
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
18 Aug 2026
18 Aug 2026
11 Sept 2026
19 Aug 2026
9 Sept 2026
26 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Part-A: ROAD WORKS | |||||
| 1 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto1000 metres(Reference to MoRT&H's specification clause 305.4.3). | 49,637.6 | m2 | 6.97 | ₹3,45,974.07 |
| 2 | Excavation in Soil using Hydraulic Excavator CK90 and Tippers with Disposal up to 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). | 4,633.86 | m3 | 85.55 | ₹3,96,426.72 |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202)
By Manual Means.
Granular courses | 7,404.03 | m3 | 587.83 | ₹43,52,310.95 |
| 4 | Construction of Embankment with Material Deposited from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 & 300-1.The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
Note In case the earth cutting is done by dozer and pushed for filling in the embankment, the input of dozer in the cost of embankment i.e. ₹ 39.63/m3 (excluding overhead, Contractor profit & L.W. cess) shall be deducted from theEstimated Rate as the same is already provided in the cost of excavation. However, if the earth is dumped by tippers from roadway cutting, the input of dozer for spreading is required to be provided. | 8,507 | m3 | 105.59 | ₹8,98,254.13 |
| 5 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm. (Reference to MoRT&H's specification clause 305). Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate.
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 17,254.82 | m3 | 220.72 | ₹38,08,483.87 |
| 6 | Construction of Embankment with Material obtained from Borrow pits
Construction of embankment with approved material obtained from borrow pits(Earth is available from Govt. land) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). | 7,394.92 | m3 | 168.17 | ₹12,43,603.7 |
| 7 | Construction of Subgrade and Earthen Shoulders.
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305).
With Fine Sand | 3,699.23 | m3 | 1,711.8 | ₹63,32,341.91 |
| 8 | Granular Sub-Base with Graded Material :
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401.
(ii) Rate per cum for grading-II Material
Using Pakur Variety Stone Aggregates & Medium sand
(Payment will be made on the basis of finished compacted volume) | 897.6 | m3 | 2,809.57 | ₹25,21,870.03 |
| 9 | Granular Sub-Base with Graded Material :
Plant Mix Method
Construction of granular sub-base by providing graded material such as natural sand/crushed gravel/crushed stone/combination depending upon the required grading spreading in uniform layers with motor grader on prepared surface, mixing by appropriate mechanical mixure (with controlled addition of water), and compacting with vibratory roller to achieve at least 98% of the maximum dry density for the material determined as per IS:2720 (Part 8), complete as per clause 401.
(v) Rate per cum for grading-V Material
Using Pakur Variety Stone Aggregates & Medium Sand..
(Payment will be made on the basis of finished compacted volume) | 727.62 | m3 | 3,087.99 | ₹22,46,883.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.01 MB
BOQ_5090744.xls
BOQ • 0.45 MB
FORM_2911ii_for_25-50cr.pdf
Tender Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].