Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC 512 CHITTILAKATTU IRIPANAM TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹31,835 (4.71%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹7.3 L+₹54,825 (8.12%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
5 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Varghese P.O
SM (P and P)-CD
Instrumentation Maintenance Work Assistance in NP, AHSB and Bagging plant of FACT-CD, Ambalamedu.
2022_FACT_724502_1
04028/2022-2023/E26368
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDN 105 and CDN 111)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
16 Dec 2022
19 Nov 2022
6 Dec 2022
19 Nov 2022
5 Dec 2022
19 Nov 2022
Instrumentation Maintenance Work Assistance in NP, AHSB and Bagging plant of FACT-CD, Ambalamedu
Cleaning & calibration check of PH sensor:The work includes removal of pH sensor from line, cleaning of sensor as per standard procedure, calibration checking of pH sensor as per procedure using standard buffer solutions after connecting with transmitter.All materials for the job will be provided by FACT free of cost.
Removal and Refixing of Temperature Elements with Thermowells/Thermowellpockets: The work includes removal of Thermowell-element assemblies/Thermowell pockets (Flange size upto size 1.5 inch, length upto 1500mm) for inspection, refurbishing the fittings, leak checking, minor welding if required for leak proofing and fixing back with proper gaskets, nuts and bolts.Note: All materials required for the work will be provided by FACT free of cost.
REMOVE & REFIX PRESSURE GAUGE:The work includes isolating the pressure gauge by closing the isolation valve, removal of Pressure Gauge (dial size 250mm max and connection 1/2" NPT) and its manifold from line, and refixing it back.All materials for the job will be provided by FACT free of cost.
CLEANING, INSPECTION AND REFIXING OF DIP TUBES:The work includes removal of Flanged dip tubes from Tanks (Tubes/pipes of size up to 3/4", Flange size up to 10 inch, length up to 7m approx.) for inspection, Transportation of the items from field to Instrumentation Lab / workshop and returning as required, and fixing back with proper gaskets, nuts and bolts. The dip-tubes should be inspected and thoroughly cleaned to ensure free airflow.All materials like gaskets and fasteners required for the work will be provided by FACT free of cost.
REMOVAL AND FIXING OF AIR FILTER REGULATOR:The work includes removal of old defective air filter regulators (end connection size ¼" or ½ ") of Control valves / I/P convertors from line & fixing new air filter regulators of same size.All materials required for the work will be supplied by FACT as free issue.
Cleaning and Checking of PM Analyser:Work includes Routine checking & cleaning of Particulate Matter (PM) Analysers system in NP Plant as per standard procedure. The work involves Cleaning/Checking of the analyser components such as -Water regulator filters, Blower intake Filters & Water Tank etc. This work shall be done in co-ordination with the Instrumentation Technician. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Cleaning and Checking of HF Analyser:Work includes Periodic checking & cleaning of Hydrogen Fluoride (HF) Analysers system in NP Plant as per standard procedure. The work involves removal of transmitter and receiver,Cleaning of the analyser stub pipes, refixing and alignment of transmitter and receiver. This work shall be done in co-ordination with the Instrumentation Technician. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Cleaning and Checking of NH3 Analyser:Work includes Periodic checking & cleaning of Ammonia (NH3) Analysers system in NP Plant as per standard procedure. The work involves removal of transmitter and receiver,Cleaning of the analyser stub pipes, refixing and alignment of transmitter and receiver. This work shall be done in co-ordination with the Instrumentation Technician. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Fabrication and Fixing/Mounting of Instrument stanchions:The Work includes fabrication of instrument stanchion (size 50 NB, SCH80 MS pipe, length approx. 130cm) with base plate of size 225mm X225mm X 6mm and fixing the stanchion using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
Fabrication and Fixing/Mounting of field Instrument supports:The work includes fabrication of instrument supports (size 50 NB, SCH80 MS/SS pipe,"L"shape size 300X 200mm approx) and fixing the support using anchor bolts or welding on "I" beam / Channels. Note: All materials required for the work will be supplied by FACT as free issue.
Installation of Junction Boxes:The work includes transportation of Junctions boxes of size 350x420x150mm (approx), Canopies/Enclosures and MS/Aluminum angles, necessary items (including free supply items from FACT) from Lab / Stores to site. The work also includes installation of the canopies/enclosures [Dimensions: 550X 450X 325mm (H X W X D)], installation & mounting of Junction boxes inside the canopies on newly fabricated AL/MS frame supports. The work shall also include fabrication of the MS/aluminum frame supports with necessary holes drilled for mounting the JBs and fixing it on to the available structures by welding/using fasteners (SS bolt,SS nut and SS washers of size M10X60 to be supplied by contractor) or grouting on to the structure including minor civil work required for fixing JBs. The supply of fasteners as detailed above is included in this item. Unused gland holes in the JBs shall be covered with proper blanking plugs. MS supports shall be painted with two coat epoxy paint over suitable primer.Note: The Junction Box, MS angles/flats and blanking plug shall be supplied by FACT free of cost.
FIXING OF ENCLOSURE GRP,FIELD INST:The work includes fixing of FRP/ GRP diagonal enclosure of size 450X400X400 (W X D X H) approx for existing field instruments. The enclosure shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles.All materials required for the work will be supplied by FACT as free issue.
FIXING OF CANOPY GRP,FIELD JB:The work involves fixing of FRP/ GRP canopies of size 550X 450X 325mm (W X D X H) approx for existing junction boxes. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles.All materials required for the work will be supplied by FACT as free issue.
FIXING OF CANOPY GRP,FIELD INST:The work includes fixing of FRP/ GRP canopies of size 360 X 445 X 370mm (W X D X H) approx for existing field instruments. The canopies shall be fixed using mounting brackets/ U clamps, nuts and washers (SS 304 material) on 2" pipe/ pedestal/angles.All materials required for the work will be supplied by FACT as free issue.
Laying of Signal/Power Cables - 1 Pair/1 Triad/2 Triad/3 Core:The work includes transportation of cables to site, Installation of signal/ power cables-1 pair/1 triad/2 Triad/3 Core with wires of size 0.5/1/1.3/2.5 SQMM by laying on new/existing cable tray/rack/clamping on the wall/structure/routing through GI pipe/trenches. The cables are to be laid from junction boxes to field instruments. Dressing of cables in racks shall be using Aluminum strips of size 20x5mm at intervals of min. 1 meter on horizontal runs and 30 cm on vertical runs. The scope of work includes fixing identification tags on both end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The aluminum flat strips shall be fixed using M6X40 SS Fasteners. The supply of fasteners and SS wire as detailed above is in the scope of contractor.Note: Cables and identification tags will be supplied by FACT free of cost.
Laying of Signal/Power Cables - 12 Pair/20 Pair/24 Core:The work includes transportation of cables to site, Installation of signal/ power cables-20 pair/12 pair/24 core with wires of size up to 2.5 SQMM by laying on new/existing cable tray/rack/clamping on the wall/structure/routing through GI pipe/trenches. The cables are to be laid from junction boxes to Junction Boxes/DCS Control Room. Dressing of cables in racks shall be using Aluminum strips of size 20x5mm at intervals of min. 1 meter on horizontal runs and 30 cm on vertical runs. Clamping of cables on structure shall be by welding and fixing suitable cleats. The scope of work also includes fixing identification tags on both end of the cables before entering the instruments, junction boxes or control room. The tags may be tied to the cable using SS wires. The supply of fasteners and SS wire as detailed above is included in this item. Note: Cables and identification tags will be supplied by FACT free of cost.
DRESSING,CABLE, MULTICORE&BRANCH:The work includes dressing of existing cables of sizes 20, 12 & 1pair/ 12 & 1 triad in a group of 10 -15 number of cables on unit length of tray on new/existing cable trays of various sizes. The work also includes arranging and dressing of the cables in ladder type/slotted MS/ aluminium cable racks/trays by using SS wire (1 sq mm dia. min) / aluminum flat strips (20x5mm) at intervals of minimum 50 cm on horizontal runs and 30 cm on vertical runs. The aluminum clamps shall be provided on the trays using M6 X40 SS Fasteners.All materials required for the work will be supplied by FACT as free issue.
GLANDING,CABLE,SIGNAL/POWER,12,20P/TRIAD:The work includes glanding of the signal and power cables of size 12/20 pair / 12 Triad on junction boxes / field instruments using double compression / single compression glands of proper size. 1.25 inch and 1.5 inch. Standard stripping tools shall be used for peeling of cables so as to ensure quality in work.All the material required for the work will be supplied by FACT as free issue.
GLANDING,CABLE,SIGNAL/POWER,1PAIR/TRIAD:The work includes glanding of the signal and power cables of size 1 pair / 1 Triad in junction boxes/field instruments using double compression / single compression glands of proper size. Standard stripping tools shall be used for peeling off cables so as to ensure quality in work.All the material required for the work will be supplied by FACT as free issue.
JB Termination connections refurbishment:Work includes refurbishment of Termination wiring connections inside Instrument Junction Boxes. The Junction Boxes house upto 20no.s of single pair cables and 1no.s of 20pair Multicable (max 80 terminations). The work involves replacement of all damaged Terminal blocks, cleaning of wire ends, putting wiring Ferrules, crimping of wire ends with lugs and tight Terminations. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Removal and Refixing of Actuators:Work includes de-coupling and removal of Actuator part from Control Valve Assembly. After related valve works have been completed, the Shift-In-Charge shall direct the worker to fix back the actuator onto the Valve body. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Seat Leakage testing of Control Valves:Work includes fixing of specified size Flanges at inlet side of a Control Valve( Body Size less than or equal to 3inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at NP area. All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
Body Leakage testing of Control Valves:Work includes fixing of specified size Flanges at inlet and outlet sides of a Control Valve(Body Size less than or equal to 3inches) using Nuts, Bolts and gaskets. Further to this the Flange inlet shall be connected to Hydraulic Pump and pressure raised as per specified ranges/setting repeatedly as per instruction from the Shift-In-Charge. The work shall be carried out at Workshops at NP Area. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Gland Packing of Control Valves:Work includes gland packing of control valves of various sizes. The gland nut, follower and spacer shall be removed.The existing worn out gland packings shall be removed properly from the Valve prior to packing with new packing glands provided. The gland nut, follower and spacer shall be fixed back The work shall be deemed to be completed if the Gland leakage test is found to be OK. All materials required for the work will be supplied by FACT as free issue. The work shall be carried out according to the instruction from the shift-In-Charge.
Replacement of Control Valve Positioner: Work includes removal of existing Positioner from Control Valves in line and replacement of these with a supplied calibrated new one. All the fitting connections has to be properly lined up without any leaks. The Positioner linkage shall be coupled to the valve correctly as per the specified Stroke length & Direction. Once installed, the Stroke of the valve shall be checked as per instruction from Shift-In-Charge.All materials required for the work will be supplied by FACT as free issue.The work shall be carried out according to the instruction from the shift-In-Charge.
LAYING STAINLESS STEEL TUBE-6&8MM:The work includes laying of 6 mm/8mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing.All materials required for the work will be supplied by FACT as free issue.
LAYING STAINLESS STEEL TUBE-10&12MM:The work includes Laying of 10mm / 12mm SS pneumatic tubing between air headers, air filter regulators, I/P Converters etc of control valves located at the plant site. The tubing will involve providing standard SS fittings from air header to control valve accessories as required. Ends shall be connected at air header tapings, air filter regulator or I/P Converter. Sharp bends shall be avoided and proper support shall be given using clamps for the pneumatic tubing.All materials required for the work will be supplied by FACT as free issue.
Fabrication and Fixing of Ladder ype Aluminum Cable tray (250mmto 400mm):The scope of work includes transportation of all necessary items (including free supply items from FACT) from Lab / Stores to site. The work also includes Fabrication of ladder type cable racks of sizes 25cm to 40cm using Aluminium angles (65x65x6mm or 50X50X6mm) and their erection. Aluminium flats of size 50X8mm shall be used as cross bars and shall be provided at intervals of 50cm(for horizontal run) by drilling two numbers of holes at each end and fixing it with fasteners [Stainless Steel-Nut, bolt (M8X40mm) and two washers]. The cross bar shall be provided at 30cm intervals for vertical run of the trays. Fixing of the rack to the existing structures shall be using suitable MS angle welded supports or using proper anchor bolts, wherever required and as decided by the Engineer-in-Charge. The work shall include painting of MS supports with two coats of epoxy paint. Fabrication shall be done as per enclosed Drawing, and instruction from the Engineer-in-Charge.The scope of contractor also includes Breaking of walls/civil structures, if any found necessary to carry out the work, Supply and installation of all other items required for the completion of work like nuts, bolts, washers, anchor bolts etc. including all necessary tools and tackles.Note: Aluminium Angles and Flats (for carrying out this work) will be supplied by FACT free of cost.
SUPPLY UNSKILLED LABOUR-8HR:Supply of unskilled workers for attending instrumentation miscellaneous works such as cleaning of local panels, control valves etc and instrument installations in general, transportation of materials from plants to lab and from stores to plants etc. on 8 hour shift basis, as directed by Engineer in Charge.
GOPINATHA PANICKER ENGINEERING CONTRACTOR
HASSAN MM
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_761986.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .