| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC NEAR BAZID BEG OFFICE 99 G FARIDAPUR CHAUDHARY IZZATNAGAR BAREILLY | BAREILLY | BAREILLY | UTTAR PRADESH | L1 | Accepted-AOC Lowest 1st | |
| 2 | L2₹4.7 L+₹17,925 (3.98%)Rejected-AOC | L2 | Rejected-AOC Lowest 2nd | |
| 3 | L3₹4.8 L+₹29,550 (6.57%)Rejected-AOC | L3 | Rejected-AOC Lowest 3rd |
Tender Value
₹4.5 L
EMD Value
₹4,500
Closing Date
23 Jan 2023, 4:00 pmClosed
SE EDC Pilibhit
Near Roadways Pilibhit
For the work of giving new connections to consumers 11 KV LT HT line pole shifting and other its related works under deposit scheme in area of Electricity Distribution Division Bisalpur.
2023_MVVNL_765622_1
T-35/EDCP/2022-23
Open Tender
Miscellaneous Works
Item Rate
365 days
Bisalpur
As per tender form
3 documents required · 3 mandatory
₹1,180
EE EDD
₹4,500
29 May 2023
9 Jan 2023
24 Jan 2023
9 Jan 2023
23 Jan 2023
9 Jan 2023
Amount
Carriage of HT/LT 8.5/9 mtr. PCC/ 11 mtr. ST Pole from store center Pilibhit to site including loading unloading at both end distance upto 80 km.
Carriage of 25/63/100 KVA T/F from store center Pilibhit to site including loading unloading at both end distance upto 80 km.
Carriage of 250 KVA T/F from store center Pilibhit to site including loading unloading at both end distance upto 80 km.
Carriage of other line material from store center Pilibhit to site including loading unloading at both end distance upto 80 km.
Erection of single HT/LT PCC 8.5/9 mtr. PCC/ 11 mtr. ST Pole including fitting of accessories. All required decentralized material shall be provided by the contractor own his cost. (All T & P and nut bolt of various size etc. Provided by firm)
Erection of double Pole structure of 8.5/9 mtr. PCC/ 11 mtr. ST Pole fitting of accessories and all required decentralized material shall be provided by the contractor own his cost.
Grouting of HT/LT PCC / STP pole with 1:4:8 CC ratio cement sand and stone grid. (All Material will be provided by Contractor own his cost).
Fixing and grouting of stay with 1:4:8 CC ratio of cement sand & stone grid, all required decentralized material shall be provided by the contractor own his cost. (All T & P and Nutt Bolt of various size etc. provided by firm)
Earthing of pole, (earthing rod provided by department and other required nut and bolts etc. provided by firm own his cost.
Laying and sagging of ACSR weasel / Dog conductor (conductor provided by Department)
Laying of AB cable 3x50/3x95 (AB cable 3x50/3x95 Provided by Department).
Mounting of 25/63/100 KV T/F on D/P and making all LT/HT connections.
Carriage & installation of new CT/PT from store center Pilibhit to site and mounting on double pole and making connection distance upto 80 km.
Carriage & installation of new 11 KV cubical metering from store center Pilibhit to site and making connection. (All T & P and nut bolt of various size etc provided by firm) distance upto 80 km.
Carriage and Laying of 33/11 KV single circuit XLPE cable by digging of trench 01 Mtr. depth and laying layer of sand with providing bricks top and both side of cable including refilling of trench. (Only 33/11 KV XLPE cable provided by Department)
Termination of 11 KV Different sizes XLPE cable by filling 11 KV heat shrinkable Jointing kits ID/OD all sizes cable boxes.
Construction of 250 KVA T/Fs plinth for 250 KVA T/F of size 5 fit x5 fit x5 fit with the help of first class bricks, cement & coarse sand as per norms. Filling the structure completely by brick blast & plastering work of walls Including CC work on top in ratio 1:2:4 by cement, stone grit & sand and grouting of 2 nos. M.S. channel of size 50x50x5 mm on the top of T/Fs plinth whole work should be done as per RESSPO norms complete in all respect. (All Material will be provided by Contractor own his cost).
Mounting of 250 KVA T/F on newly constructed plinth, laying of cable jumpering and making all HT/LT connections complete work in all respect.
Earthing of T/Fs by boaring type up to water level by providing GI pipe and making connection from boaring site to body and neutral of T/F. (All Material will be provided by Contractor own his cost).
TYCOON ENGINEERS
M/S HINA ELECTRICALS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .