| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAdmitted-Fee/PreQual/Technical/Finance NULL | ₹18.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹20.5 L+₹1.6 L (8.46%)Admitted-Fee/PreQual/Technical/Finance | ₹20.5 L+₹1.6 L (8.46%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.9 L+₹2.0 L (10.4%)Admitted-Fee/PreQual/Technical/Finance | ₹20.9 L+₹2.0 L (10.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MUHAMMED RIYAZ K C L2 | Ajith E P L3 | SUBAIR. K.S. L1 |
|---|---|---|---|---|---|---|
| 1.00FIRST FLOOR CONSTRUCTION, COMPOUND WALL CONSTRUCTION&INTERLOCK | ||||||
| 1.00 | OD456312/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
(MOD 50.6.7.2 of DAR) | 26.46 | cum | 6,580.32 ₹1,74,102.11 | 6,697.44 ₹1,77,200.87 | 5,500 ₹1,45,519 Lowest |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 128.19 | sqm | 806.54 ₹1,03,388.75 | 820.9 ₹1,05,229.53 | 625 ₹80,117.5 Lowest |
| 1.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 45.42 | metre | 191.41 ₹8,693.84 Lowest | 194.82 ₹8,848.72 | 200 ₹9,084 |
| 1.00 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 27.49 | sqm | 857.47 ₹23,573.57 | 872.73 ₹23,993.09 | 700 ₹19,244.4 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 65.09 | sqm | 640.1 ₹41,662.83 | 651.49 ₹42,404.18 | 550 ₹35,798.4 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.32 | sqm | 324 ₹1,399.68 Lowest | 329.77 ₹1,424.61 | 350 ₹1,512 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 27.31 | cum | 11,278.85 ₹3,08,036.67 | 11,479.59 ₹3,13,519.08 | 10,000 ₹2,73,110 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,071.31 | kilogram | 94.33 ₹1,95,386.96 | 96 ₹1,98,846.05 | 86 ₹1,78,132.92 Lowest |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 2.72 | cum | 6,643.68 ₹18,057.52 Lowest | 6,761.92 ₹18,378.9 | 6,900 ₹18,754.2 |
Tender Value
₹22.8 L
EMD Value
₹50,000
Closing Date
15 Sept 2026, 5:00 pmClosed
Assistant Engineer Taliparamba Municipality
Thaliparamba municipality
Puzhakulangara Anganwadi FFconstruction and compound wall
2026_LSGD_867696_3
E1/TPBA/1/2026
Open Tender
Civil Works - Buildings
Item Rate
thaliparamba
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
18 Sept 2026
5 Sept 2026
17 Sept 2026
5 Sept 2026
15 Sept 2026
5 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1FIRST FLOOR CONSTRUCTION, COMPOUND WALL CONSTRUCTION&INTERLOCK | |||||
| 1.001 | OD456312/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
(MOD 50.6.7.2 of DAR) | 26.46 | cum | - | - |
| 1.002 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 128.19 | sqm | - | - |
| 1.003 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 45.42 | metre | - | - |
| 1.004 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 27.49 | sqm | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 65.09 | sqm | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.32 | sqm | - | - |
| 1.007 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 27.31 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,071.31 | kilogram | - | - |
| 1.009 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 2.72 | cum | - | - |
stage.html
html • 0.02 MB
finance_1469386.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
viewnit.pdf
Tender Documents • 0.03 MB
viewsbd.pdf
Tender Documents • 2.00 MB
BOQ_1469386.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .