Loading…
Loading…
Tender Value
₹46.3 L
EMD Value
₹92,600
Closing Date
15 Jun 2026, 6:00 pm
EE PWD DISTT. DIV. KOTA
EE PWD DISTT. DIV. KOTA
Remaning Work of Package No. RJ-23-11/Nagar Palika Kaithoon /2022-23 in District Kota
2026_CEPWD_564550_2
EE PWD DISTT. DIV. KOTA NITNO-04/2026-27
Open Tender
Civil Works
90 days
KOTA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
500 EE PWD DISTT. DIV. KOTA
₹92,600
Yes
3 Jun 2026
3 Jun 2026
16 Jun 2026
3 Jun 2026
15 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | ||||||
| 1.01 | eq[; ugj ls xksnY;kgsMh dh x<kj dh vksj uxj ikfydk lhek rd (chVh jksM) | - | Each | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | Total | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | ||||||
| 2.01 | eq[; ugj ls xksnY;kgsMh dh x<kj dh vksj uxj ikfydk lhek rd (chVh jksM) | - | Each | - | - | BI01010001010000000000000515BI0100001113 |
| 2.02 | txnh'k lqeu ds edku ls Nrjh dqn dh vksj (lh lh jksM) | - | Each | - | - | BI01010001010000000000000515BI0100001113 |
| 2.03 | Total | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 3Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | ||||||
| 3.01 | eq[; ugj ls xksnY;kgsMh dh x<kj dh vksj uxj ikfydk lhek rd (chVh jksM) | 1 | Each | - | - | BI01010001010000000000000515BI0100001113 |
| 3.02 | txnh'k lqeu ds edku ls Nrjh dqn dh vksj (lh lh jksM) | - | Each | - | - | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.71 MB
Tendernotice_2.pdf
PDF • 1.40 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_1004786.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid