Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹23.3 L+₹98,666.60 (4.41%)Rejected-AOC | L2 | Rejected-AOC l2 |
Tender Value
₹20.3 L
EMD Value
₹50,000
Closing Date
18 Jun 2022, 6:05 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD roads Division, Idukki
RM-2022- 23/CLUSTER II/One Year RC-Zone V -For various PWD Roads under Roads Section Nedumkandom in Idukki District-2 Road stretches for a length of 7.00 Km-GENERALRM-2022-23/CLUSTER II/One Year RC-Zone V -For various PWD Roads under Roads Section Ne
2022_PWD_492230_2
45/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
365 days
Idukki
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹50,000
Yes
26 Aug 2022
13 Jun 2022
20 Jun 2022
13 Jun 2022
18 Jun 2022
13 Jun 2022
60 days
Amount
Appendix 1 Corrective Works
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD15472/2022-2023:Providing ,laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm (Type-A) or 13.2mm to 0.9mm (Type-B) aggregates using penetration grade bitumen to required line , grade and level to serve as wearing course on previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification clause 509 of MORD. Type A :- By manual means.
Appendix 2 - Pre monsoon works.
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
OD15698/2022-2023:Engaging coolie
55.15:Refurbishment of existing signboards<br>Refurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
10.11:Removal of earth from the choked hill side drain and disposing it on the valley side manually
Appendix 3 - Prevention Works.
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD15701/2022-2023:Providing ,laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2mm to 0.9mm (Type-A) or 13.2mm to 0.9mm (Type-B) aggregates using penetration grade bitumen to required line , grade and level to serve as wearing course on previously prepared base , including mixing in a suitable plant , laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification clause 509 of MORD. Type A :- By manual means.
5.11.b:Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion (SS) and water on a road surface including cleaning of the surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface. Type - II - (4 6 mm thickness) Filling of surface cracks 1 - 3 mm and preventive / renewal treatments.
Appendix 4 -Natural calamity/Emergency Works.
OD19318/2022-2023:Conducting and reporting Routine Inspections for the entire length of the Project road frequency of 7 days throughtout the agreement period of the Running contract as directed by the departmental officers at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc . and are not measurable/payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
OD19319/2022-2023:Engaging small tipper including fuel charge and all other expenditures etc. complete.
OD19320/2022-2023:JCB
KURINJIYIL BUILDERS
Bidder Name
KURINJIYIL BUILDERS
ALEN JOSE
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_709675.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .