Loading…
Loading…
Tender Value
₹27.5 L
EMD Value
₹55,000
Closing Date
15 Oct 2026, 3:00 pm7d left
EE RWD ALMORA
EE RWD ALMORA VIKASH BHAWAN
Construction work of Residential Building Type-03, House No. 01 in Vikas Khand Takula
2026_RES_100744_1
796 Dated 24.09.2026
Open Tender
Civil Works - Buildings
Item Rate
365 days
Takula Almora
Construction work of Residential Building Type-03, House No. 01 in Vikas Khand Takula
2 documents required · 2 mandatory
₹2,360
EE RWD Rs 2000 Departmental Head Rs 360 GST
₹55,000
1 Oct 2026
1 Oct 2026
15 Oct 2026
2 Oct 2026
15 Oct 2026
2 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavat in foundation trenches or drains (not exceeding 1.5 m in width or 1 including dressing of sides and ramming of bottoms, lift upto 1.5 out the excavated soil and disposal of surplus excavated soil as direction of Engineer in charge upto 50 m distance.(All kinds of soil.) | 60.05 | cum | 276.88 | ₹16,626.64 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 17.15 | cum | 208.49 | ₹3,575.6 |
| 3 | Providing and laying in position cement concrete of specified grade 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).All work upto plinth level | 12.71 | cu.m | 7,245.95 | ₹92,096.02 |
| 4 | Providing and laying cement concrete in retaining walls, return walls,walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing :1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 0.38 | cu.m | 10,525.56 | ₹3,999.71 |
| 5 | Providing and laying in position specified grade of reinforced cement Concrete Work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.44 | cu.m | 9,621.99 | ₹1,10,075.57 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 5.11 | cu.m | 11,544.32 | ₹58,991.48 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 21.23 | cu.m | 12,238.44 | ₹2,59,822.08 |
| 8 | Centring and shuttering for foundations, footings, bases of columns, etc. for mass concrete. | 19.2 | sq.m | 417.13 | ₹8,008.9 |
| 9 | Centring and Shuttering for Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 98.7 | sq.m | 986.31 | ₹97,348.8 |
| 10 | Centring and Shuttering for Columns, Pillars, Piers, Abutments, Posts and Struts. | 80.06 | sq.m | 783.31 | ₹62,711.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
BOQ_118748.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .