Commissioner Nagar Nigam Jodhpur
Nagar Nigam Jodhpur
Construction of Boundary Wall, Pillars and Fencing Work in Nagar Nigam Jodhpur (Zone 3)
2026_DLB_529566_3
NIT 4609 DATE 19.01.2026
Open Tender
Civil Works
Percentage
Nagar Nigam Jodhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Commissioner Nagar Nigam Jodhpur and MDRISL
₹54,230
Yes
4 Feb 2026
19 Jan 2026
4 Feb 2026
19 Jan 2026
3 Feb 2026
19 Jan 2026
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground/ Road top level Depth upto 1.5 m
Carriage of Materials by mechanical transport including loading, unloading and stacking ::Earth 5 km
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand)
Extra for random rubble masonry with hard stone in superstructure above plinth level and upto two stories.
Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete.Cold twisted bars
Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) Deep groove pointing
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Clearing Grass and Removal of Rubbish (Maximum 150mm) by manual means and disposal at a lead of 50 metres as per MoRT&H specification clause 201.
Providing and fixing 1.2 metres high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x 6 mm placed every 3 metres center to center founded in M15 grade cement concrete, 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckles etc complete as per clause 807 of MoRTH specification & type "A" as per IS : 278-1978 size designation 5 (line wire 2.24, point wire 2.00mm mass 97-106 g/m) including all material, labour.
Gravel/Quarry spall at Site with all lead and lift
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
BOQ_944448.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .