Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹83,589.58Accepted-AOC | 1 | Accepted-AOC LOWEST | |
| 2 | Rejected-Technical ENNAZHIYIL H KANHIRAMUKKU POST MALAPPURAM PIN 679584 | MALAPPURAM | KERALA | 679584 | - | Rejected-Technical HIGHEST |
| Sl No | Description | Qty | Unit | ASHARAF PP L1 | SIVADASAN E L2 |
|---|---|---|---|---|---|
| 1.00compound wall | |||||
| 1.00 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 3.9 | cum | 7,286.49 ₹28,417.31 Lowest | 7,689.27 ₹29,988.15 |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 100.6 | sqm | 337.93 ₹33,995.76 Lowest | 356.61 ₹35,874.97 |
| 1.00 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 94 | sqm | 191.25 ₹17,977.5 Lowest | 201.82 ₹18,971.08 |
| 1.00 | OD233933/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 0.29 | cum | 901.91 ₹261.55 Lowest | 951.76 ₹276.01 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.35 | cum | 8,440.99 ₹2,937.46 Lowest | 8,907.58 ₹3,099.84 |
Tender Value
₹84,010
EMD Value
₹2,100
Closing Date
3 Sept 2025, 6:55 pmClosed
ASSISTANT ENGINEER MARANCHERYGP
ASSISTANT ENGINEER MARANCHERYGP
Annual Plan-Construction of compound wall for Veterinary Hospital second stage
2025_LSGD_791490_25
AE/LSGD/MRY/2025-26/2
Open Tender
Civil Works - Buildings
Item Rate
120 days
MARANCHERY
Please refer Tender documents.
9 documents required · 9 mandatory
₹555
Yes
₹2,100
Yes
4 Oct 2025
27 Aug 2025
8 Sept 2025
27 Aug 2025
3 Sept 2025
27 Aug 2025
Amount
compound wall
50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
OD233933/2025-2026:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
SIVADASAN E (BID ID -2320428)
Bidder Name
SIVADASAN E
ASHARAF PP
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1306486.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .