Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 CrAdmitted-Finance | -27.61% | ₹4.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.2 Cr+₹51,559.08 (0.12%)Admitted-Finance | -27.51% | ₹4.2 Cr+₹51,559.08 (0.12%) | L2 | Admitted-Finance |
| 3 | L3₹4.3 Cr+₹10.3 L (2.45%)Admitted-Finance | -25.59% | ₹4.3 Cr+₹10.3 L (2.45%) | L3 | Admitted-Finance |
| 4 | L4₹4.4 Cr+₹23.5 L (5.60%)Admitted-Finance | -23.00% | ₹4.4 Cr+₹23.5 L (5.60%) | L4 | Admitted-Finance |
| 5 | L5₹4.6 Cr+₹38.3 L (9.12%)Admitted-Finance | -20.10% | ₹4.6 Cr+₹38.3 L (9.12%) | L5 | Admitted-Finance |
Tender Value
₹5.6 Cr
EMD Value
₹11.2 L
Closing Date
30 Mar 2026, 4:00 pmClosed
Executive Engineer RnB Division Tangmarg
Office of the Executive Engineer RnB Division Tangmarg
Up-gradation Of Kunzer Hardshoora Road (NABARD RIDF XXXI).
2026_PWDJK_304616_1
NIT No. 138/RnB/Tangmarg of 2025-26
Open Tender
Civil Works
Percentage
540 days
Tangmarg
Please refer Tender documents.
12 documents required · 12 mandatory
₹8,500
Executive Engineer RnB Division Tangmarg
₹11.2 L
Superintending Engineer PWD RnB Circle Baramulla
11 Apr 2026
26 Feb 2026
31 Mar 2026
6 Mar 2026
30 Mar 2026
6 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction Part. (a) Widening of Road | |||||
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 7,602.15 | Cum | 187.3 | ₹14,23,882.7 |
| 1.02 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. | 680 | No. | 379.05 | ₹2,57,754 |
| 1.03 | Beyond 60 cm girth upto and including 120 cm girth. | 101 | No. | 1,683 | ₹1,69,983 |
| 2(b) Pavement | |||||
| 2.01 | Supply and filling of Nallah Muck/GSB incl. spreading, watering, ramming and consolidation with 8-10 tone capacity Road Roller incl. all carriages / leads & lifts, incidental and consequential costs complete (work to be executed as per relevant IS codes and as directed at site). | 1,200 | Cum | 1,000 | ₹12,00,000 |
| 2.02 | Supply, stacking and laying of water bound macadam with specified stone agg. ,stone screening and binding materials incl screening sorting, spreading to template and consolidation with PRR of 8-10 ton capacity etc complete. Base course with 63mm to 45mm size ( Quarry from Wuyan incl stone screening 13.2mm @ 16% and binding material @ 8% incl. all carriages complete job | 600 | Cum | 2,400 | ₹14,40,000 |
| 2.03 | Scarifying the existing bituminous road surface to a depth of 50mmand disposal of scarified material within all lifts and leadupto 1 km (by mechanical means). | 18,250 | Sqm | 5.55 | ₹1,01,287.5 |
| 2.04 | Providing, laying, spreading and compacting graded stone aggregate (size range 53mm to 0.075 mm) to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, transporting the mixed material by mechanical transport from the plant upto the site of work, laying the mixed material in uniform layers with mechanical paver finisher on well prepared surface and compacting the same with vibratory roller of 8 to 10 tonne capacity to achieve the desired density / compaction as per specifications and directions of Engineer Incharge, including cost and carriage of all materials, hire charges of machinery, all taxes etc complete | 600 | Cum | 1,885.95 | ₹11,31,570 |
| 2.05 | Providing and applying tack coat using hot straight run bitumen of grade –VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On WBM / WMM Surface @ 0.75 Kg/ Sqm | 8,000 | Sqm | 74.35 | ₹5,94,800 |
stage.html
html • 0.04 MB
techsummary_989500.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.81 MB
sbd.pdf
Tender Documents • 2.12 MB
BOQ_989500.xls
BOQ • 0.34 MB
corrigendum_NIT_138_2025_26_II.pdf
PDF • 0.70 MB
Extension_Notice_NIT_No_138_2025_26.pdf
PDF • 0.25 MB
corrigendum_NIT_138_2025-26.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .