| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹7.3 LAccepted-AOC | 1st | Accepted-AOC Lowest | |
| 2 | 2nd₹7.7 L+₹34,586.63 (4.73%)Accepted-AOC | 2nd | Accepted-AOC 2nd lowest | |
| 3 | 3rd₹7.7 L+₹41,183.38 (5.63%)Accepted-AOC | 3rd | Accepted-AOC 3rd lowest | |
| 4 | 5th₹8.5 L+₹1.1 L (15.6%)Accepted-AOC PALLIYAN HOUSE KARUKUTTY PO ERNAKULAM DT 683576 | ERNAKULAM | KERALA | 683576 | 5th | Accepted-AOC Highest | |
| 5 | 4th₹8.3 L+₹95,411.30 (13.0%)Rejected-AOC ALAPATKIZHAKKUDAN HOUSE ATTORE KUTTUR P O THRISSUR | THRISSUR | THRISSUR | KERALA | 4th | Rejected-AOC 4th lowest |
Tender Value
₹8.9 L
EMD Value
₹13,500
Closing Date
26 Aug 2021, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Head Works Sub division, Peechi
Peechi Scheme Maintenance Improvement work to Pattikkad branch canal 2.500 to 2.650 Km
2021_Irrig_435592_1
11/AEE/2021-22
Open Tender
Civil Works - Canal
Item Rate
120 days
Pattikkad
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,800
₹13,500
9 Nov 2021
18 Aug 2021
31 Aug 2021
18 Aug 2021
26 Aug 2021
18 Aug 2021
Amount
Appendix a
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per the direction of departmental officers at site
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) as per the direction of departmental officers at site
10.1 : Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. as per the direction of departmental officers at site
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) as per the direction of departmental officers at site
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns as per the direction of departmental officers at site
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) as per the direction of departmental officers at site
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete as per the direction of departmental officers at site
Martin A A
THOMAS P A
JOSE K C
JAMES P J
Bidder Name
JAMES P J
JOSE K C
jittogeorge
THOMAS P A
Martin A A
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_619022.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.23 MB
Epaymentrequisition2.pdf
Tender Document • 0.00 MB
11Forms83and84.pdf
Tender Document • 0.44 MB
PreliminaryAgreement.pdf
Tender Document • 0.07 MB
BOQ_619022.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .