Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 LAccepted-AOC 06 07 2023 3 CORRIGENDUM AMENDMENT NO 01 DATED 04 07 2023 4 CORRIGENDUM AMENDMENT NO 02 DATED 07 08 2023 SE FINANCIAL BID OPENED ON 07 08 2023 SIR WE ARE PLEASED TO INFORM YOU THAT YOUR OFFER FOR THE WORK IN SUBJECT MATTER HAS BEEN ACCEPTED AS PER TERMS CONDITIONS OF THE TENDER DOCUMENTS REFERRED ABOVE THE BROAD TERMS AND CONDITIONS ARE AS DETAIIEC BELOW CONSULTANCY FEE 0 54 ZERO POINT FIVE FOUR PERCENT OF PROJECT COST INCLUSIVE OF ALL TAXES PROJECT COST SHALL BE LOWEST OF THE FOLLOWING 4 THE ACTUAL COST OF THE PROJECT ON COMPLETION OR 2 DPR PRELIMINARY COST APPROVED BY NBCC CLIENT OR 3 ESTIMATED COST OF THE PROJECT PUT TO TENDER II COMPLETION PERIOD 18 MONTHS III DEFECT LIABILITY PERIOD 12 MONTHS IV PERFORMANCE 2 OF THE VALUE OF TOTAL CONSULTANCY FEES OF CONSULTANT TO GUARANTEE BE SUBMITTED IN THE FORM OF BG WITHIN 45 DAYS FROM THE | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹29.5 L+₹1.5 L (5.50%)Rejected-Finance | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹31.5 L+₹3.5 L (12.6%)Rejected-Finance K701 MARVEL ZEPHYR KHARADI PUNE MAHARASHTRA 411014 UDYAM MH 26 0652381 27AADCE9912F1ZM B R | PUNE | MAHARASHTRA | 411014 | L3 | Rejected-Finance Not lowest | |
| 4 | L4₹34.4 L+₹6.5 L (23.2%)Rejected-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | L4 | Rejected-Finance Not lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical Not fulfills NIT Criteria |
| Sl No | Description | Qty | Unit | MATHURUGAM AND ASSOCIATES L1 | GEO DESIGNS AND RESEARCH PVT LTD L4 | M/S HIERARCHY STRUCTURES L2 | Eyrie Projects & Technology Pvt. Ltd. L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | 1. Design and preparation of architectural design/drawings, structural design/drawings, schedule of finishes, Design and internal services schedules as per scope for subject work (attached at Appendix 'C').
2. “GRIHA” guideline for Green Building Norms to be followed as per latest GRIHA VERSION MANUAL or latest SVA GRIHA MANUAL (as applicable) to ensure minimum 3-star GRIHA rating and Super ECBC Compliance. Methodology and scope to be adopted is specified in tender document . List of bldgs and total approx plinth area ( 9713.26 Sqm) as follows. 'GRIHA' guidelines and Norms shall be followed for buildings as specified at Appendix 'C' only for star marked buildings.
3. Preparation of Estimate ,Yard stick and BOQ including detailed working out details duly priced on SSR 2020 and latest market rate for all structures & services. Format for Estimation , BOQ, Abstract, Yard stick, Break down of quantities, Break down of quantities of Materials & Cost , Break down of labourers as.mentioned in tender documents.
Note: The contractor is required to submit all its submittals like Drawings, Documents, reports, Schedules, invoice copies, etc. in 3 (Three) Hard & 1 (One) soft (CD/DVD) copies at the time of approval and 7 (Seven) Hard & 3 (Three) soft (CD/DVD) copies in case of final submission. | 1 | Job | 27,96,300 ₹27,96,300 Lowest | 34,44,000 ₹34,44,000 | 29,50,000 ₹29,50,000 | 31,50,000 ₹31,50,000 |
Tender Value
₹40.0 L
EMD Value
₹79,900
Closing Date
15 Aug 2025, 6:00 pmClosed
CE SHILLONG
HQ CE SHILLONG ZONE, SPREAD EAGLE FALLS, SHILLONG, MEGHALAYA 793011
CONSULTANCY SERVICE FOR DESIGN PREPRATION OF DRGS AND ESTIMATE OF KLP LESS TECH AND OPS COMPLEX AT GANESHBARI UNDER GE DINJAN No.2
2025_MES_716931_1
89866/DIN/E8/CONSULTANCY
Open Tender
Consultancy Services
Item Rate
150 days
Ganeshbari
All as per NIT and tender document
2 documents required · 2 mandatory
₹500
GE DINJAN NO 2
₹79,900
23 Sept 2025
26 Jun 2025
18 Aug 2025
26 Jun 2025
15 Aug 2025
1 Aug 2025
Amount
1. Design and preparation of architectural design/drawings, structural design/drawings, schedule of finishes, Design and internal services schedules as per scope for subject work (attached at Appendix 'C'). 2. “GRIHA” guideline for Green Building Norms to be followed as per latest GRIHA VERSION MANUAL or latest SVA GRIHA MANUAL (as applicable) to ensure minimum 3-star GRIHA rating and Super ECBC Compliance. Methodology and scope to be adopted is specified in tender document . List of bldgs and total approx plinth area ( 9713.26 Sqm) as follows. 'GRIHA' guidelines and Norms shall be followed for buildings as specified at Appendix 'C' only for star marked buildings. 3. Preparation of Estimate ,Yard stick and BOQ including detailed working out details duly priced on SSR 2020 and latest market rate for all structures & services. Format for Estimation , BOQ, Abstract, Yard stick, Break down of quantities, Break down of quantities of Materials & Cost , Break down of labourers as.mentioned in tender documents. Note: The contractor is required to submit all its submittals like Drawings, Documents, reports, Schedules, invoice copies, etc. in 3 (Three) Hard & 1 (One) soft (CD/DVD) copies at the time of approval and 7 (Seven) Hard & 3 (Three) soft (CD/DVD) copies in case of final submission.
M/S HIERARCHY STRUCTURES (BID ID -3386661)
Eyrie Projects & Technology Pvt. Ltd. (BID ID -3380710)
GEO DESIGNS AND RESEARCH PVT LTD (BID ID -3383321)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .