Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-Finance VILLAGE DALLU P O BIJAPUR TEHSIL JAISINGHPUR DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 176001 | L1 | Accepted-Finance L1 | |
| 2 | L2₹9.9 L+₹22,934 (2.36%)Rejected-Finance 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | L2 | Rejected-Finance L2 | |
| 3 | L3₹12.7 L+₹3.0 L (30.9%)Rejected-Finance CHOKHNA TEHSIL GHUMARWIN DISTT BILASPUR HP | BILASPUR | HIMACHAL PRADESH | 174001 | L3 | Rejected-Finance L3 |
Tender Value
₹12.1 L
EMD Value
₹24,000
Closing Date
31 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
O/O EE HPPWD DIVISION GHUMARWIN
Construction of Vety. Dispensary Malot , Tehsil Ghumarwin, Distt. Bilaspur H.P SH Providing and laying cement concrete 1 3 6 , RCC 1,1.5,3, Steel work , tile work , Plastering and paiting thereof Deposit work
2026_PWD_146593_8
8048-54 dt. 23/10/2026
Open Tender
Civil Works
Percentage
30 days
GHUMARWIN
AS PER SBD
9 documents required · 9 mandatory
₹500
₹24,000
19 Nov 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
31 Oct 2026
24 Oct 2026
24 Oct 2026 - 31 Oct 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as10 sqmon plan) including getting out and disposal of excavated earth lead upto 50m and lift upto1.5m ,as directed by Engineer-in-charge. All kinds of soil including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 47.55 | Per cubic metre | 211.86 | ₹10,073.94 |
| - | Providing and laying cement concrete 1:3:6 (one cement is to three sand is to six crushed graded stone aggregate 40mm (forty millimetre) nominal size including cost of centring and shuttering in Foundations and plinth as per direction of Engineer-In-Charge with in all leads and lifts and other incidentals. The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 11.85 | Per cubic metre | 4,576.27 | ₹54,228.8 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:6 (one cement is to six coarse sand) including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 55.76 | Per cubic metre | 10,264.7 | ₹5,72,359.67 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 12.88 | Per square metre | 411.02 | ₹5,293.94 |
| 4.1 | Suspended floors, roofs, landings, balconies and access platform including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 40.95 | Per square metre | 495.76 | ₹20,301.37 |
| 4.2 | Lintels, beams, plinth beams, girders, bressumers and cantilevers including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 47.03 | Per square metre | 402.54 | ₹18,931.46 |
| 4.3 | Edges of slabs and breaks in floors and walls including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 32.24 | Per running metre | 131.36 | ₹4,235.05 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with ( M-20) 1:1.5:3 (one cement is to one point five coarse sand is to three crushed graded stone aggregate 20 mm nominal size) including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 12.61 | Per cubic metre | 6,016.95 | ₹75,873.74 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more including carriage of materials with in all leads lifts and other incidentals as per direction of Engineer-in-Charge.The rate includes octroi, Malkana, Toll Tax, Building and Other Construction Worker Welfare Cess, royalty or any other tax, levy or cess in respect of input for or output by this contract, which shall be payable by the Contractor. Goods and Services Tax (GST) shall be excluded from the rate and shall be payable separately as per applicable rules. Government shall not entertain any claim whatsoever in this respect of the same. | 1,513.2 | Per Kilogram | 76.27 | ₹1,15,411.76 |
| - | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length ( hold fast lugs or dash fastener shall be paid for separately). 2nd class deodar wood as per the direction of Engineer-in Charge.The rate includes, octroi, royality Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 0.3 | Per Cubic metre | 88,621.99 | ₹26,586.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
sbd8.pdf
Tender Documents • 3.22 MB
BOQ_218603.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .