Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
30 Jun 2026, 6:00 pmClosed
Executive Engineer’s office, Valsad (R&B) Division,
Repairing of Old Rest House at Pardi, Ta.Pardi, Dist.Valsad. (Concrete Work Compound Wall & Miscellaneous Work)
316829
10 Of 2026-27
Open
Civil - All
Works
Valsad
8 documents required · 8 mandatory
₹900
Executive Engineer, Valsad (R&B)Division, Valsad
₹17,000
23 Jun 2026
23 Jun 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
Name of Work :-
Repairing of Old Rest House at Pardi, Ta.Pardi, Dist.Valsad. (Concrete Work, Compound Wall &
Miscellaneous Work)
Bill of Quantities
(A) Percentage Rate Tender (Up to INR 50 Cr. )
Memorandum showing items of work to be carried out
Ite Quantity Unit Estimated Total Amount
Ite Quantity Unit Estimated Total Amount
No. Item of work In figure estimated
Rs. Ps. quantities
1 Excavation for foundation upto 1.50 mt depth including sorting out and 130.0 Cumt 117.08
stacking of useful materials and disposing the excavated stuff all lead
& lift(A) Loose or soft soil.
2 Excavation for foundation 1.50 mt to 3.00 mt depth including sorting out 130.00 Cumt 162.56
and stacking of useful materials and disposing the excavated stuff upto
50 mt lead (B) Dense or hard soil
3 Providing and laying controlled cement concrete M.150 and curing 13.00 Cumt 3894.07
complete including the cost of formwork but excluding the cost of
reinforcement for reinforced concrete work in (A) Foundations and plinth
4 Providing and laying controlled cement concrete M.250 and curing 140.50 Cumt 4819.72
complete including the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in(A) Foundations, footings,
and Mass concrete. footing
5 Filling available excavated Earth (Excluding Rock) in trench plinth side of 106.00 Cumt 130.39
foundation . in layer not excluding 20 cm in depth consolidation each
deposited layer by ramming and watering etc. complete
6 Providing and laying controlled cement concrete M-200 and curing 3.50 Cumt 7878.42
complete including the cost of form work but excluding the cost of
reinforcement for reinforced concrete work in Columns, pillars posts and
7 Brick work using common burnt clay building bricks crushing strength not 22.50 Cumt 4295.99
less than 35 Kg/Sq.cm. in super structure above plinth level upto floor
two level in cement mortar 1:6 (1cement : 6 fine sand) (B) Conventional
For Ground Floor
8 Providing and laying controlled cement concrete M-200 for RCC work 1.50 Cumt 6523.59
and curing complete including the cost of form work but excluding the
cost of reinforcement for reinforced concrete work in coping on Ground
9 Providing TMT Bar FE 500D reinforcement for R.C.C. work including 7719.00 KG 76.22
bending, binding and placing in position complete up to All floor Level
10 20 mm Thick sand faced cement plaster on walls upto height 10 meters 230.50 Sqmt 300.66
above ground level consisting of 12 mm Thick backing coat of c.m. 1:3 (1
cement : 3 sand) and 8 mm Thick finishing coat of c.m. 1:1 (1 cement :
sand) with 18mm wide x10mm deep Groves at juction of structure
member etc. complete.
11 Removing dry or oil bound distemper by a washing and scraping and sand 125.50 Sqmt 12.32
papering the wall surface smooth including necessary repairs to scratches
12 Wall Painting (Two coats) with weather proof acraylic emulsion (Apex or 356.00 Sqmt 114.53
equivalent type) paint of approved brand and manufacture and of
required shade on exterior wall surface to give an even shade over and
including primery coat with Alkaly resistance primer of approved brand
after thoroughly brushing surface to remove all dust and remains of
loose powdered material etc. copm. for all height
13 Demolition including stacking of serviceable materilas and disposal of 20.00 Cumt 1048.51
unserviceable materials with all lead and lift. (i) R.C.C. work
14 Demolition of Brick work and stone masonry including stacking of 85.00 Cumt 546.08
serviceable materilas and disposal of unserviceable materials with all lead
and lift.(ii) In Cement Mortar.
In Words Sixteen Lakh Seventy Nine Thousand Three Hundred Thirty Seven Rupees And Eighty Nine Paisa Only.
I/We am /are willing to carry out the work at…………% above/below percent (should be written in figures and words) at the
estimated rates mentioned above amount of my/your tender works out as under.
*Estimated Amount *Estimated Amount
put to Tender Rs. 1679337.89 put to Tender Rs.
Deduction …………….. % below………………… Add ………… % above Rs. …………….
1 The Credit Value of Dismentalled Materials of Amount Rs.11560.00 (In Words Eleven Thousand Five Hundred Sixty Rupees
And Zero Paisa Only.) shall be recovered from the 1st Running Bill of the Contractor.
2 The Contractor shall be exhibit board as per government circular No.BDG/3277/1657 N dated 26/01/1997 S (M.GUJ) with
detailed specification and details of work and amount Involved at site without any payment as directed by Engineer-In-
3 All work shall be carried out as per public work department hand book and other specifications of Division or as directed.
4 All columns in the Schedule should be filled in ink & the total of the entries in the last column should be struck by Contractor
under his sign.
5 Rates quoted include clearance of site (Prior commencement of work and its close) in all respects and hold good for work
under all condition, site, moisture/ weather etc.
6 The Boards stating the detailed specification & detailes of Work shal be provided by the contractor as per Government
Resolution T.No.1890-240- Dtd.18/11/1990 and directed by contractor at his own cost immediately on recommanding the
7 Testing of Material Shall be done as per the statement attached with specification,The material IS Tested in GERI by
Executive Engineer Surat and Bill for the testing charges shall be paid by Executive Engineer,1% of the Amount put to
8 1% of the Construction Cost Shall be deducted from the bill Amount of the contract as per the Buildig and other
Construction works walfare cess at 1996(Labour and Employment Department Letter No CWA-2004-1831-M(3)Dated
9/12/2005 notification Of Labour & Employment department dt.03/01/2005 & Labou & Employment Department Letter no
9 In Case of RCC items Where there is a change in Grade of Mix or Change as per Actual Mix design the cost of difference of
Cement Difference shall be deducted from the rate of original item at the rate of star rate mentioned in the tender.
10 Contractor are advised to visit site before loading tender rate.
11 Necessary wiring point and drainage point are installed at Site however any modification in electrical installation and
drainage & water supply connection and minor correction to perform experienced in Lab shall be done by contractor at his
12 The Rates are inclusive of all the taxes (Excluding GST),Transport Charges,Octroi duty and storage Charges up to date.
13 The materials Covered for wiring should be got approved from the Engineer Incharge of the work.
14 GST and Income tax TDS will be deducted at a source while making payments of bills.
15 GST will be paid extra as per Govt. amendment.
16 The Materials on the work shall have to be used and carried out as specified in technical note.
I/We hereby Declare that I/we have Visited the site and fully Exquisite myself/ourselves with the local situation regarding
(A) materials,Labour and other factors pertaininfg to work before submitting tender.
I/We hereby Declare that I/we have carefully Studied the condition of Contracts,Detailed Specification and other tender
Document of this work and agree to execute the same accordingly.
Deputy Executive Engineer
Valsad (R&B) Sub-Division
Signature of Bidder
Executive Engineer
Valsad (R&B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.pdf
Building Booklet.pdf
GR 1.pdf
GR.pdf
NIIT.pdf
SBD.pdf
Specification.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .