Loading…
Loading…
Tender Value
₹19.4 L
EMD Value
₹38,737
Closing Date
1 Jul 2026, 3:00 pmClosed
O/O the Executive Engineer, Div-III, AMC
Executive Engineer, Div-III, AMC
Construction of CC road RCC dain with cover slab st from Panchamukh road to Santanagar Anganwadi centre under ward No 46 AMC.
2026_SAMC_74148_1
14/EE/Div-III/AMC/2026-27
Open Tender
Civil Works
Percentage
AMC
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹38,737
Yes
25 Jun 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
1 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | - | cum | 1 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | - | cum | 1 | - |
| 3 | Providing and laying dry flat brick flooring in required pattern complete. | - | sqm | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 1 | cum | - | - |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : In plinth and skirting courses, fillets, columns, pillars, posts and struts: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | - | - |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
| 7 | First class brick work in foundation and plinth
including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ). | - | cum | - | - |
| 8 | 12 mm cement plaster of mix In cement mortar 1:4 (1cement:4 fine sand) | - | sqm | 1 | - |
| 9 | Neat cement punning | - | sqm | 1 | - |
| 10 | Centering shuttering including struttings, propping etc.and removal of form work for:1 Foundations, footings, bases for columns etc. for mass
concrete with timber plank | - | sqm | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
DNIT.pdf
Tender Documents • 4.09 MB
BOQ_75466.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .