Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹70.9 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹72.7 Cr+₹1.8 Cr (2.51%)Admitted-Finance 357 KOTKAPURA ROAD STREET NO 8 MUKTSAR PUNJAB 152026 | SRI MUKTSAR SAHIB | PUNJAB | 152026 | L2 | Admitted-Finance | ||
| 3 | L3₹72.9 Cr+₹2.0 Cr (2.82%)Admitted-Finance 239 PHASE 2 MODEL TOWN BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | L3 | Admitted-Finance | ||
| 4 | L4₹74.9 Cr+₹4.1 Cr (5.71%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹76.3 Cr+₹5.4 Cr (7.64%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹82.8 Cr
EMD Value
₹1.7 Cr
Closing Date
23 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer (East) Cum Additional Secretary CAD
Chief Engineer (East) Cum Additional Secretary CAD Jaipur Sinchai Bhawan JLN Marg 302017
Lining work of Bundi Branch Canal Km 5.181 to 37.917 Km of LMC, Chambal CAD Bundi.
2022_CADKO_287544_1
NIT No. 02 of 2022-23 Item No. 03
Open Tender
Civil Works - Canal
Percentage
1095 days
District Bundi
As per Technical Bid
3 documents required · 3 mandatory
₹15,000
Executive Engineer LMC Division CAD Bundi
₹1.7 Cr
Yes
Jaipur
27 Sept 2022
22 Jul 2022
24 Aug 2022
22 Jul 2022
23 Aug 2022
22 Jul 2022
22 Jul 2022 - 23 Aug 2022
3 Aug 2022
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting & clearance of jungle , bushes , shrubs Ankra / ipomoea , Julicflora typha etc. on canals and bunds in dry / moist / slushy conditins including disposal as per instructions of the Engineer - in - charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. | |||||
| 1.01 | Thick Jungle | 3,32,673.8 | sqm | 2.5 | ₹8,31,684.5 |
| 2 | Dismantling Cement Concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. | 15,533.84 | Cum | 644.3 | ₹1,00,08,453.11 |
| 3 | Dismantling old plaster or skirting, racking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 m lead , inclusive of dewatering whereever required. | 184.68 | sqm | 20 | ₹3,693.6 |
| 4 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material wihtin 50 m lead inclusive of de-watering wherever required in cement mortar | 3,071.72 | cum | 487.6 | ₹14,97,770.67 |
| 5Cutting and uprooting of trees including removing of roots and filling of hole, . Cutting / up rooted would be property of the department | |||||
| 5.01 | over 15 cms to 30 cms dia | 660 | Each | 126 | ₹83,160 |
| 6 | Earthwork in excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect in Hard/dense soil. | 3,64,859.58 | Cum | 93 | ₹3,39,31,940.94 |
| 7 | Earthwork in excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect in Hard rock not requiring blasting | 4,014.54 | Cum | 229 | ₹9,19,329.66 |
| 8 | Earth work in rough (Borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist including laying in 20 cm layers . (beforecompaction) breaking of clods, sorting of grass pebbles etc, and dressing compacted by sheep footroller / pneumatic tyred roller to obtain dry density of 98% of Standard Proctor's density with initial lift of 1.5 m (Excluding charges for compaction & watering) including loading and unloading whereever required complete in all respect. (a) with intial lead of 250 m | 25,678.72 | Cum | 124 | ₹31,84,161.28 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.86 MB
FBItem03.pdf
Tender Documents • 12.54 MB
BOQ_510360.xls
BOQ • 0.32 MB
TCItem03.pdf
Tender Documents • 2.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .