Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
3 Oct 2026, 3:00 pm6d left
NITHIN C S
SM (P and P)-CD
Pre-Fabrication and Erection of SS 316 Acid pipe lines in Connection with replacement of remaining Cast Iron acid pipe lines in SA Plant, FACT-CD
2026_FACT_926701_1
4097/2026-2027/E34158
Limited
Miscellaneous Works
Item Rate
180 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
18 Sept 2026
18 Sept 2026
5 Oct 2026
18 Sept 2026
3 Oct 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pre-Fabrication and Erection of SS 316 Acid pipe lines in Connection with replacement of remaining Cast Iron acid pipe lines in SA Plant, FACT-CD | |||||
| 1.01 | Fabrication of Pipeline and Fittings with SS 316 L Materials size 25 NB to 200 NB for replacing CI pipes and fittings in product acid pumping lines and recycle lines
The required materials shall be transported from store / site.New pipes,fitting, special fittings etc shall be fabricated with SS 316 L material. The required mitre bends/mitre fittings shall also be fabricated if required to suit the site conditions in SS 316L material. Elbows,tees and reducers shall be fabricated in addition as required at site in SS316L material. The pipes shall be cut by plasma cutting machine, length as per instructions from engineer in charge. Pipe ends shall be ground properly and take suitable bevel / single Vee. The pipes/fittings/mitres shall be fabricated by TIG Welding (with argon purging) with stub ends and MS flanges/welded SS 316L flanges. All welding shall be 100% DP tested.Pipes shall be in pieces or in full pipe length as per instructions from engineer in charge. | 1,500 | Inch Dia | - | - |
| 1.02 | Erection of Fabricated SS 316 L Pipe and Fittings
Make necessary site arrangements for the work.The newly fabricated SS 316 L pipe lines with fittings shall be transported to site. The SS 316 L pipes with fittings shall be erected / fixed in position at all elevations with proper gaskets and fasteners/welding pipejoint at site. Flange joints shall be tightened properly to avoid any leakage.Temporary supports shall be provided as required. The route/orientation of the pipelines shall be as per approved drawings/site instructions. Any pipelines joint requires welding at site shall be done by TIG welding only after proper bevelling of joints. The pipelines shall be erected without any strain. Any rework required shall be done.All welding joints shall be 100% DP tested. Pipelines shall be erected along side existing lines and necessary supports shall be provided and duirng ATA /shutdown connections shall be given. After complete erection entire pipeline circuit shall be successfully leak tested.Site shall be cleared off scrap, unused pipes shall be neatly stacked in the area earmarked. | 2,000 | Inch Meter | - | - |
| 1.03 | Fabrication of stub end rings from SS 316L Plates, size 25 NB to 200 NB.
The required stub end rings [size25 NB to 200 NB] shall be marked and cut from SS 316L plates [8 to 12mm thick for SS316L using plasma cutting machine. The rings shall be transported to FACT CD work shop for final machining and back to site. Ring edges shall be ground properly and take suitable bevel / single Vee.12/10 mm scrap SS 316L plates shall be made use for cutting stub ends. | 100 | NO | - | - |
| 1.04 | Fabrication and Erection of Pipeline Supports
Collection of required materials from FACT -CD stores / plant area and transport to the work site at SA Plant. New structural supports for pipeliens/pipe bridges/ saddle supports etc shall be fabricated and erected at site as per relevant drawing/ instruction of the officer - in -charge to meet site requirement. | 4 | MT | - | - |
| 1.05 | Dismantling and Removal of Pipelines/Structurals:
The existing CS/CI pipelines [all sizes] and structural supports,pipe bridges shall be cut and removed from all heights and elevations as per the instructions from engineer in charge to facilite erection and rerouting of cooling water and acid headers. Damaged pipes shall be transported to scrap yard, after taking the weight and deposited in the appropriate areas ear marked for different materials. Usable materials shall be transported to specific locations and neatly stacked as per instruction. | 8 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
Compliance.pdf
Tender Documents • 0.09 MB
SpecialConditions.pdf
Tender Documents • 0.17 MB
Tenderdocuments.pdf
Tender Documents • 1.33 MB
BOQ_973834.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .