| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 L+₹7,648 (2.26%)Rejected-AOC VILL P O GANGA SAGAR P SAGAR SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | ₹3.5 L+₹7,648 (2.26%) | L2 | Rejected-AOC L2 |
| 3 | L3₹3.5 L+₹9,346 (2.76%)Rejected-Finance | ₹3.5 L+₹9,346 (2.76%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Improper document uploaded |
Tender Value
₹3.4 L
EMD Value
₹6,798
Closing Date
13 Dec 2025, 3:00 pmClosed
EXECUTIVE ENGINEER, KAKDWIP IRRIGATION DIVISION
Irrigation Waterways Directorate Office of the Executive Engineer Kakdwip Irrigation Division Postal address Kakdwip, South 24 Parganas
Emergent restoration to Sundarban Embankment damaged due to Full moon Kotal on and from 04.11.2025 to 07.11.2025 for a length of 45.00 M Banbibi Mondir facing Bay of Bengal at Mouza Dhablat under Sagar Irrigation Sub - Division of Kakdwip
2025_IWD_952775_1
WBIW/EE/KIDIVISION/e-NIT- 12 (e)/2025-26
Open Tender
CIVIL WORKS
Percentage
14 days
SAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,798
Yes
2 Sept 2026
21 Nov 2025
15 Dec 2025
21 Nov 2025
13 Dec 2025
21 Nov 2025
Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed (ii) 12.5 cm av. Diameter
Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and lacing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles (a) Where boats are not necessary. (ii) 12.5 cm av. diameter
Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site a) For thinner end 10 to 15 cm.
Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:-Volume of earth / sand filled bags should not be less than 0.028 cum / bag.
Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts.
Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430 gsm as filter, as per specification, including cost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles.
Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, after deduction of void as per norms. No extra payment will be made for stacking .NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement A) Beyond 4.00 km and upto 5.00 km.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 1.01 MB
BOQ_2280077.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .