Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.0 LAccepted-AOC 189 ANAND VIHAR SAPROON DISTT SOLAN H P | SAPROON | SOLAN | HIMACHAL PRADESH | L1 | Accepted-AOC Lowest 1 | |
| 2 | L2₹64.5 L+₹1.5 L (2.35%)Rejected-AOC HIMACHAL PRADESH | L2 | Rejected-AOC Lowest 2 | |
| 3 | L3₹75.1 L+₹12.1 L (19.3%)Rejected-AOC SCF 5 SECTOR 18C C O GPB INFRAPROJECTS PRIVATE LIMIT CHANDIGARH CHANDIGARH CHANDIGARH 160018 | CHANDIGARH | CHANDIGARH | 160018 | L3 | Rejected-AOC Lowest 3 |
| Sl No | Description | Qty | Unit | SHASHANK KUMAR L1 | Kartike Guleria L2 | GPB Infraprojects Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation work of all kind of soil by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils within all lead and lifts as per the direction of Engineer in Charge at site. | 66.82 | Per Cubic Meter | 100 ₹6,682 Lowest | 290 ₹19,377.8 | 495 ₹33,075.9 |
| 2.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 28.13 | Per Cubic Meter | 1,000 ₹28,130 Lowest | 1,100 ₹30,943 | 1,450 ₹40,788.5 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 29.76 | Per Cubic Meter | 3,500 ₹1,04,160 Lowest | 5,300 ₹1,57,728 | 4,950 ₹1,47,312 |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 10.05 | Per Cubic Meter | 7,900 ₹79,395 | 7,800 ₹78,390 | 6,950 ₹69,847.5 Lowest |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 9.29 | Per Cubic Meter | 7,900 ₹73,391 | 7,900 ₹73,391 | 7,800 ₹72,462 Lowest |
| 6.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 32.84 | Per Cubic Meter | 7,900 ₹2,59,436 Lowest | 8,100 ₹2,66,004 | 8,450 ₹2,77,498 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 16.56 | Per Square Meter | 200 ₹3,312 Lowest | 398 ₹6,590.88 | 550 ₹9,108 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 52.74 | Per Square Meter | 250 ₹13,185 Lowest | 410 ₹21,623.4 | 700 ₹36,918 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 16.92 | Per Square Meter | 250 ₹4,230 Lowest | 410 ₹6,937.2 | 800 ₹13,536 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 72 | Per Square Meter | 200 ₹14,400 Lowest | 410 ₹29,520 | 950 ₹68,400 |
Tender Value
₹80.8 L
EMD Value
₹1.6 L
Closing Date
21 Aug 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
HPTDC Head Office Kashmir House Dharamshala Distt. Kangra (H.P)
Construction of Prefeb Structure for HPTDC Cafe at Auhar Distt. Bilaspur (H.P)
2026_HPTDC_140562_1
Proj./4-118/2022
Open Tender
Civil Works
Item Rate
120 days
HPTDC Cafe Auhar Bilaspur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
₹1.6 L
Dharamshala
19 Nov 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
21 Aug 2026
4 Aug 2026
4 Aug 2026 - 21 Aug 2026
13 Aug 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work of all kind of soil by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils within all lead and lifts as per the direction of Engineer in Charge at site. | 66.82 | Per Cubic Meter | 1.25 | ₹83.52 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 28.13 | Per Cubic Meter | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 29.76 | Per Cubic Meter | 100 | ₹2,976 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 10.05 | Per Cubic Meter | 53 | ₹532.65 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 9.29 | Per Cubic Meter | 10 | ₹92.9 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 32.84 | Per Cubic Meter | 11 | ₹361.24 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 16.56 | Per Square Meter | 10 | ₹165.6 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 52.74 | Per Square Meter | 22 | ₹1,160.28 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 16.92 | Per Square Meter | - | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers as per the direction of Engineer-In-Charge including carriage of materials within all leads, lifts and heights. | 72 | Per Square Meter | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
TenderNoticeAuharPrefeb.pdf
Tender Documents • 0.11 MB
Contractagreement.pdf
Tender Documents • 1.36 MB
Sampleofworkdone.pdf
Tender Documents • 0.02 MB
technicalbiddingformat.pdf
Tender Documents • 0.06 MB
BOQ_208494.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .