Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical MAIN ROAD JARHI SURAJPUR DISTT SURAJPUR C G 497235 | SURAJPUR | CHHATTISGARH | 497235 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical NEAR BHARTIYA VIDYA MADIR CHURCHA DISTT KOREA CHHATTISGARH 497339 | CHURCHA | KOREA | CHHATTISGARH | 497339 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical WARD NO 14 CHURCHA COLLIERY DISTT KORIYA C G PIN 497339 | KOREA | CHHATTISGARH | 497339 | Admitted-Fee/PreQual/Technical |
Tender Value
₹34.1 L
EMD Value
₹42,700
Closing Date
9 Sept 2026, 5:00 pmClosed
GM (Oprn.)
Office of the General Manager, Baikunthpur Area, Distt - Korea (C.G) 497335
Construction of 09 Nos of RCC Isolation Stopping for sealing of proposed Main Dip 2 depillaring panel of West Block of Chrucha Mine RO
2026_SECL_364341_1
SECL/BKP/GMO/2026-27/CW/eT/05 DT 26.08.2026
Open Tender
Civil Works - Others
Item Rate
364 days
West Block of Churcha Mine RO
Please refer Tender document
4 documents required · 4 mandatory
₹42,700
10 Sept 2026
27 Aug 2026
10 Sept 2026
29 Aug 2026
9 Sept 2026
29 Aug 2026
29 Aug 2026 - 2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Work | |||||
| 1.01 | Groove Cutting/ Floor cutting for stopping / Manhole by chisel & hammer d) Coal | 17.65 | Cum | 1,952.3 | ₹34,458.09 |
| 2 | Groove Cutting/ Floor cutting for stopping / Manhole by chisel & hammer a) Hard stone | 10.39 | Cum | 6,875.48 | ₹71,436.24 |
| 3 | Centering & shutteringinc including strutting propping etc and removal of form of all heights: wall (any thickness)including attached pilasters, buteresses, plinth and string courses etc. | 471.44 | Sqm | 461.18 | ₹2,17,418.7 |
| 4 | Reinforcement for Cement Concrete work in wall (any thickness) including attached pilaster, buttesses plinth and string courses,fillets, column, pillars,piers, abutments, posts and structs etc, above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1:5:3 | 145.88 | Cum | 11,922.67 | ₹17,39,279.1 |
| 5 | 12 mm cement / lime plastering ratio of 1:6 up to 5 meter and above in UG. | 662.24 | Sqm | 436.27 | ₹2,88,915.44 |
| 6 | Loading of materials into tub-loading of materials into Tub at surface. | 237.27 | Cum | 298.77 | ₹70,889.16 |
| 7 | Un-loading of materials at destination point in UG. | 237.27 | Cum | 216.92 | ₹51,468.61 |
| 8 | Leading for trasportation of materials for every 15 mtr or part by head load for 50 m. (40 % more work load than the face.
( Qty= 5leads X 237.27= 1186.35cum) | - | Cum | 147.79 | - |
| 9 | Mulma Cleaning / removal of debris from galleries & cleaning of belt roadway and stacking / loading with 50 m. | 76.91 | Cum | 775.18 | ₹59,619.09 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 1.55 MB
Tendernotice_3.pdf
PDF • 0.88 MB
BOQ_377251.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .