| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC | ₹50.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.0 L+₹30,509.96 (0.60%)Rejected-AOC VEENNIROTH HOUSE KUTTIATTOOR PO | ₹51.0 L+₹30,509.96 (0.60%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | JAYADEVAN V L2 | ANIL KUMAR K L1 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 210 | sqm | 17.04 ₹3,578.4 | 16.94 ₹3,557.4 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 183.29 | cum | 337.08 ₹61,782.38 | 335.07 ₹61,413.98 Lowest |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 34.14 | cum | 683.48 ₹23,332.64 | 679.4 ₹23,193.36 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 19.89 | cum | 7,433.65 ₹1,47,877.6 | 7,389.22 ₹1,46,993.75 Lowest |
| 1.00 | OD84269/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer - in-charge. All work up to plinth level | 47.8 | cum | 10,204.24 ₹4,87,772.88 | 10,143.26 ₹4,84,857.97 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,248.86 | kilogram | 105.35 ₹5,52,967.4 | 104.72 ₹5,49,660.62 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 68.4 | sqm | 361.85 ₹24,750.54 | 359.69 ₹24,602.8 Lowest |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 182.52 | sqm | 945.08 ₹1,72,496 | 939.43 ₹1,71,464.76 Lowest |
| 1.01 | OD84295/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer - in-charge. All work above plinth level up
to floor V level | 47.46 | cum | 12,110.7 ₹5,74,822.26 | 12,038.33 ₹5,71,387.3 Lowest |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
17 Mar 2026, 11:00 amClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER PWD BUILDINGS DIVISION, THALASSERY
GENERAL- single cell-Construction of five single cell in Special sub jail Kannur-General Civil Work-1
2026_PWD_846103_1
88/2025-26
Open Tender
Civil Works - Buildings
Item Rate
Kannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
7 Jul 2026
10 Mar 2026
19 Mar 2026
10 Mar 2026
17 Mar 2026
10 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Estimate | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.8 | cum | - | - |
| 1.003 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 1 | cum | - | - |
| 1.004 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | OD84269/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer - in-charge. All work up to plinth level | - | cum | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.007 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.009 | OD84295/2024-2025:Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer - in-charge. All work above plinth level up
to floor V level | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429222.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1429222.xls
BOQ • 0.34 MB
SBD.pdf
Tender Documents • 2.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .