Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.1 LAdmitted-Fee/PreQual/Technical/Finance | -50.21% | ₹23.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹23.4 L+₹29,250.84 (1.27%)Admitted-Fee/PreQual/Technical/Finance | -49.58% | ₹23.4 L+₹29,250.84 (1.27%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹23.8 L+₹67,726.57 (2.93%)Admitted-Fee/PreQual/Technical/Finance | -48.75% | ₹23.8 L+₹67,726.57 (2.93%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹24.1 L+₹1.0 L (4.48%)Admitted-Fee/PreQual/Technical/Finance | -47.98% | ₹24.1 L+₹1.0 L (4.48%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹26.4 L+₹3.3 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | -43.11% | ₹26.4 L+₹3.3 L (14.3%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹46.4 L
EMD Value
₹92,720
Closing Date
2 May 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Clearance of Lake b.w.o Selective manual De-weeding of Manasbal Lake.
2026_PWDJK_308324_2
NIT No.06-2026-27
Open Tender
Civil Works
Percentage
1 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division Ganderbal
₹92,720
7 May 2026
21 Apr 2026
2 May 2026
21 Apr 2026
2 May 2026
21 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Selective of Manual De-weeding in lake by deployment of Labours along with boats/necessary tools for 100.00 Mtr width avg. from Pedestrain walk way for clearance of water expansive (to achieve aesthitic look) and to keep the water expanse neat and clean free from all floating material upto completion of wok and has to maintain b.w.o continous de-weeding operation and clearance of floating material incl. carriage of extracted weed. Floating material, weeds, etc into the boats which will further carry upto the disposal site. Net quantity @ 50% to 75% density of total effective area of operation considering volume @ 3 cum/100 sqm with minimum progress for de-weeding @1.75 cum per labour along with boat and maintaining its growth after de-weeding@ density 20% to30% of total effective area considering volume @3 cum/100 sqm with minimum progress @ 1.75 cum/Labour along with boat incl. making waterway where-ever required in order to stack the weed for measurement of same as directed by EIC . | - | Lab. | - | - |
| - | Carriage /Disposal of Manure or sludge (weeds) from Site of stack measurement upto dumping site via mechanical transport upto an avg. lead of 3 Kms beyond manasbal areas or as desired by EIC or WMDA department all complete . | - | Cum | - | - |
| - | Supplying of life jackets for labours of standard quality & Manufactured (Pattern, Design, Quality & Colour of life jackets to be approved by EIC all complete | - | No.'s | - | - |
stage.html
html • 0.04 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_999321.xls
BOQ • 0.24 MB
c06.pdf
PDF • 0.89 MB
e06.pdf
PDF • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .