| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 CrAccepted-AOC | ₹5.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.3 Cr+₹35.6 L (6.01%)Rejected-Finance | ₹6.3 Cr+₹35.6 L (6.01%) | L2 | Rejected-Finance L2 |
| 3 | L3₹6.3 Cr+₹38.8 L (6.54%)Rejected-Finance UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹6.3 Cr+₹38.8 L (6.54%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | CHANDRABHUSHAN TIWARI L1 | S.K.S. ASSOCIATES L3 | R K GREEN CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 2,398.5 | Cum | 95.7 ₹2,29,536.45 | 50 ₹1,19,925 Lowest | 130 ₹3,11,805 |
| 2.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 303.1 | 10,250 | Cum | 152.25 ₹15,60,562.5 | 60 ₹6,15,000 Lowest | 180 ₹18,45,000 |
| 3.00 | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 9,322.5 | Sqm. | 3 ₹27,967.5 | 1 ₹9,322.5 Lowest | 44.5 ₹4,14,851.25 |
| 4.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 2,398.5 | Cum | 1,496 ₹35,88,156 Lowest | 1,720 ₹41,25,420 | 2,050 ₹49,16,925 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,468.75 | Cum | 1,914 ₹66,39,187.5 Lowest | 2,200 ₹76,31,250 | 2,200 ₹76,31,250 |
| 6.00 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 33,000 | Sqm. | 33 ₹10,89,000 Lowest | 38 ₹12,54,000 | 35 ₹11,55,000 |
| 7.00 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. | 1,980 | Cum | 8,787 ₹1,73,98,260 Lowest | 10,000 ₹1,98,00,000 | 9,200 ₹1,82,16,000 |
| 8.00 | Providing and applying tack coat with bitumen (VG-10) using bitumen Emulsion pressure distributor @ 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per MoRTH Specification 5.2 (503). | 66,000 | Sqm. | 10 ₹6,60,000 Lowest | 11.5 ₹7,59,000 | 12 ₹7,92,000 |
| 9.00 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 990 | cum | 10,005 ₹99,04,950 Lowest | 11,000 ₹1,08,90,000 | 10,500 ₹1,03,95,000 |
| 10.00 | Earth work In excation in foundation (SI. No. 251) | 3,944 | Cum | 95.7 ₹3,77,440.8 | 20 ₹78,880 Lowest | 130 ₹5,12,720 |
Tender Value
₹7.0 Cr
EMD Value
₹13.9 L
Closing Date
22 Nov 2025, 12:30 pmClosed
SE Mzp circle pwd mirzapu
SE Mzp circle pwd mirzapu
In district Bhadohi Widening and strengthening of GT road madhosingh to Khamariya LD road
2025_CEMRZ_1088635_1
4775/SE-MZP CIR/2024-25 Date-13.10.2025
Open Tender
Civil Works
Item Wise
360 days
Bhadohi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,720
Yes
₹13.9 L
Yes
SE Mzp circle pwd mirzapur
2 May 2026
10 Nov 2025
22 Nov 2025
10 Nov 2025
22 Nov 2025
10 Nov 2025
21 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 2,398.5 | Cum | 1 | ₹2,398.5 |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 303.1 | 10,250 | Cum | 1 | ₹10,250 |
| - | Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 9,322.5 | Sqm. | 1 | ₹9,322.5 |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 2,398.5 | Cum | 100 | ₹2,39,850 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,468.75 | Cum | 100 | ₹3,46,875 |
| - | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. | 33,000 | Sqm. | 100 | ₹33,00,000 |
| - | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. | 1,980 | Cum | 100 | ₹1,98,000 |
| - | Providing and applying tack coat with bitumen (VG-10) using bitumen Emulsion pressure distributor @ 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per MoRTH Specification 5.2 (503). | 66,000 | Sqm. | 100 | ₹66,00,000 |
| - | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects | 990 | cum | 100 | ₹99,000 |
| - | Earth work In excation in foundation (SI. No. 251) | 3,944 | Cum | 100 | ₹3,94,400 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tendernotice_2.pdf
PDF • 1.12 MB
Tendernotice_3.pdf
PDF • 0.76 MB
Tendernotice_4.pdf
PDF • 0.96 MB
BOQ_1997704.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .