Tender Value
₹1.9 Cr
EMD Value
₹3.7 L
Closing Date
28 Jul 2026, 12:00 pm
Provision of portals at VPDA yard and MOG Yard in place of TTC in the jurisdiction of SSP depot.
TRD-SEE-ET-26-27-5
TRD-SEE-ET-26-27-5
Open
9 Months
Unknown (Unspecified Location)
₹0
₹3.7 L
2 Jul 2026
2 Jul 2026
14 Jul 2026
1-" Supply of galvanised fabricated steel structure for traction masts /
" Supply of galvanised fabricated steel structure for traction masts / portals & dwarf masts"
2-"Erection of galvanised fabricated steel structure for traction masts /
"Erection of galvanised fabricated steel structure for traction masts / portals & dwarf masts"
3- Supply of Fabricated steel work other than OHE Mast.
Supply of Fabricated steel work other than OHE Mast.
4- Erection of Fabricated steel work other than OHE Mast.
Erection of Fabricated steel work other than OHE Mast.
5-Supply of cantilever assembly for OHE without insulator
Supply of cantilever assembly for OHE without insulator
6- Erection of cantilever assembly for OHE without insulator
Erection of cantilever assembly for OHE without insulator
7- Supply of Stay insulator.
Supply of Stay insulator.
8- Erection of Stay insulator.
Erection of Stay insulator.
9- Supply of Bracket insulator.
Supply of Bracket insulator.
10- Erection of Bracket insulator.
Erection of Bracket insulator.
11-Supply of guy rod assembly complete set for dwarf mast.
Supply of guy rod assembly complete set for dwarf mast.
12-Erection of guy rod assembly complete set for dwarf mast.
Erection of guy rod assembly complete set for dwarf mast.
13-Foundation(1:3:6) with core filling
Foundation(1:3:6) with core filling
14- Supply of 9 Ton Insulators.
Supply of 9 Ton Insulators.
15- Erection of 9 Ton Insulators.
Erection of 9 Ton Insulators.
16-Supply of Catenary ending clamp
Supply of Catenary ending clamp
17- Erection of Catenary ending clamp
Erection of Catenary ending clamp
18- Supply of Contact ending clamp.
Supply of Contact ending clamp.
19- Erection of Contact ending clamp.
Erection of Contact ending clamp.
20- Supply of structure bond (4.75 m).
Supply of structure bond (4.75 m).
21- Erection of structure bond (4.75 m).
Erection of structure bond (4.75 m).
22- Supply of inter track (5 m) bond.
Supply of inter track (5 m) bond.
23- Erection of inter track (5 m) bond.
Erection of inter track (5 m) bond.
24- Supply of rail bond (1.5/2.5 m)
Supply of rail bond (1.5/2.5 m)
25- Erection of rail bond (1.5/2.5 m)
Erection of rail bond (1.5/2.5 m)
26-Supply.of Section insulator assembly complete in all respect.
Supply.of Section insulator assembly complete in all respect.
27- Erection of Section insulator assembly complete in all respect.
Erection of Section insulator assembly complete in all respect.
28-Supply of Fixed termination assembly
Supply of Fixed termination assembly
29- Erection of Fixed termination assembly
Erection of Fixed termination assembly
30-GI Nut Bolt ( 16x50x38)
GI Nut Bolt ( 16x50x38)
31-GI Nut & Bolt ( 16x360x57)
GI Nut & Bolt ( 16x360x57)
32-GI Nut & Bolt ( 16x260x57)
GI Nut & Bolt ( 16x260x57)
33-GI Nut & Bolt ( 20x550x57)
GI Nut & Bolt ( 20x550x57)
34-GI Nut & Bolt ( 20x320x57)
GI Nut & Bolt ( 20x320x57)
35-GI Nut & Bolt ( 16x220x57)
GI Nut & Bolt ( 16x220x57)
36-GI Nut & Bolt ( 20x260x57)
GI Nut & Bolt ( 20x260x57)
37-S.S Nut & Bolt ( 10x35x30)
S.S Nut & Bolt ( 10x35x30)
38-S.S Nut & Bolt ( 12x45/55x30)
S.S Nut & Bolt ( 12x45/55x30)
39-Supply of Earthing Station (RI 7021) as per drg. No. ETI/OHE/P/7020
Supply of Earthing Station (RI 7021) as per drg. No. ETI/OHE/P/7020
40- Erection of Earthing Station (RI 7021) as per drg. No.
Erection of Earthing Station (RI 7021) as per drg. No. ETI/OHE/P/7020
41-Cutting and removal of gavanised mast and TTC.
Cutting and removal of gavanised mast and TTC.
42-Dismantaling and removal of CLA
Dismantaling and removal of CLA
43-Supply of 25 KV single pole (1600 Amp) isolator with earthing heal.
Supply of 25 KV single pole (1600 Amp) isolator with earthing heal.
44- Erection of 25 KV single pole (1600 Amp) isolator with earthing heal.
Erection of 25 KV single pole (1600 Amp) isolator with earthing heal.
45-Supply of solid copper bus bar connector. (Bus terminal) (RI 1009-1)
Supply of solid copper bus bar connector. (Bus terminal) (RI 1009-1)
46-Erection of solid copper bus bar connector. (Bus terminal) (RI 1009-
Erection of solid copper bus bar connector. (Bus terminal) (RI 1009-1)
47-Supply of Large copper jumper 160 sq mm of 5 meter length each.
Supply of Large copper jumper 160 sq mm of 5 meter length each.
48- Erection of Large copper jumper 160 sq mm of 5 meter length each.
Erection of Large copper jumper 160 sq mm of 5 meter length each.
49-Supply of 25 KV post insulator
Supply of 25 KV post insulator
50-Erection of 25 KV post insulator
Erection of 25 KV post insulator
51-PG Clamp (1030 - 3)
PG Clamp (1030 - 3)
52-Charges for road crane working for dismantling and removing of
Charges for road crane working for dismantling and removing of portals under power
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-VIB.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
B.Gformate.pdf
ATTACHMENT
Correctionslip2.pdf
ATTACHMENT
Correctionslip5.pdf
ATTACHMENT
Correctionslip6.pdf
ATTACHMENT
Correctionslip7.pdf
ATTACHMENT
GCC_IndianRailways-April-2022.pdf
ATTACHMENT
GCCCorrectionSlipNo.3.pdf
ATTACHMENT
GCCCorrectionSlipNo.4.pdf
ATTACHMENT
RailwayboardletterofCorrectionslip1.pdf Railway board letter of Correction
ATTACHMENT
someimpotantpoint.pdf
ATTACHMENT
UDINclarification.pdf
ATTACHMENT
Tenderpapr.pdf
ATTACHMENT
Correctionslip8.pdf
ATTACHMENT
Correctionslip9.pdf
ATTACHMENT
Correctionslip10.pdf
ATTACHMENT
ExplanatoryVDP.pdf
ATTACHMENT
Correctionsboard11.pdf
ATTACHMENT
RailwayboardletterofCorrectionslip1.pdf
ATTACHMENT
Download all tender documents and submit your bid