Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.7 L+₹20,424.99 (1.94%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.4 L+₹90,795.42 (8.63%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹10.5 L
EMD Value
₹15,805
Closing Date
4 Aug 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Forest Officer Thenmala
Divisional Forest Office Thenmala
COST OF CONSTRUCTION OF 150 NOS OF PERMANENT CAIRNS IN ANACHADY - AMBANADU AREA IN ARYANKAVU RANGE DURING 2021-22
2021_FD_429813_1
C3-2549/21
Open Tender
Civil Works - Others
Item Rate
120 days
ARYANKAVU RANGE
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,745
Yes
₹15,805
Yes
20 Nov 2021
12 Jul 2021
6 Aug 2021
12 Jul 2021
4 Aug 2021
12 Jul 2021
90 days
Amount
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od65313/2021_2022 Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil,trimming the sides of trenches by manual means as directed, within a lead of 50 m.<br>
od65314/2021_2022 Breaking rubble and chiseling the stone to suitable size for masonry work<br>Hard rock (blasting prohibited)
60.7.9 RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand).
13.1.2 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
13.33.1 Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
od65315/2021_2022 Labour engaged for carrying materials through rough terrain.
SHAJAM ENTERPRISES
MUBARAK T P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_610002.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .