Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical LINK ROAD PITHORAGARH | PITHORAGARH | PITHORAGARH | UTTARAKHAND | 262501 | Accepted-Technical admitted |
| 2 | Accepted-Technical | Accepted-Technical admitted |
| 3 | Not Admitted-Fee/PreQual/Technical ROOMPUR | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹9.9 L
Closing Date
22 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the Superintending Engineer, 2nd Circle
Office of the Superintending Engineer, 2nd Circle PWD Nainital
Road Safety work of Betalghat Bhataroujkhan Taurad moter road (MDR), District Nainital (under Road Safety head).
2023_pwd_66111_1
4720/41M-22/23 dated 21-11-2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Nainital
As per attached Standard Bid Document
2 documents required · 2 mandatory
₹5,900
EE Costruction Division PWD Nainital
₹9.9 L
Yes
Superintending Engineer, 2nd Circle PWD Nainital
5 Feb 2024
4 Dec 2023
10 Jan 2024
4 Dec 2023
22 Dec 2023
6 Dec 2023
4 Dec 2023 - 22 Dec 2023
6 Dec 2023
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .