Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC PO CHAUBATIA RANIKHET DISTT ALMORA UTTARAKHAND 263645 | ALMORA | UTTARAKHAND | 263645 | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹8.6 L+₹1.8 L (26.8%)Rejected-Finance 160 PREM NAGAR BAREILLY | L2 | Rejected-Finance Not lowest tenderer | |
| 3 | L3₹8.7 L+₹1.9 L (27.9%)Rejected-Finance | L3 | Rejected-Finance Not lowest tenderer | |
| 4 | L4₹12.2 L+₹5.4 L (79.4%)Rejected-Finance 22 JANKALYAN SOCIETY NAVJIVAN AJWA ROAD BARODA 390 019 | BARODA | VADODARA | GUJARAT | 390019 | L4 | Rejected-Finance Not lowest tenderer |
Tender Value
Refer Docs
EMD Value
₹25,240
Closing Date
27 Dec 2021, 6:00 pmClosed
GE Ranikhet
GE Ranikhet
SPECIAL REPAIR TO RETAINING WALL NEAR BLDG NO 67 SM BK AT CHAUBATTIA UNDER GE RANIKHET
2021_MES_491408_1
GE/RKT/65 OF 2021-2022
Open Tender
Civil Works
Item Rate
180 days
Chaubattia Ranikhet
Class E cat a(I)
6 documents required · 6 mandatory
₹500
GE Ranikhet
₹25,240
Yes
4 Jan 2022
30 Nov 2021
29 Dec 2021
30 Nov 2021
27 Dec 2021
15 Dec 2021
Amount
BOQ ( Sch 'A') B/R items Excavating in trenches in hard / dense soil n exc 1.50 m wide and n exc 1.50 m in depth for foundation for pipes, walls, cesspits, manholes, pier holes, cables etc n exc 10 Sqm on plan and n exc 1.50 m in depth and getting out complete all as specified and directed
Returning, filling in, spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each in hard / dense soil complete all as specified.
Removal of excavated soil to a distance not exc. 50m and depositing where directed at a level not exc. 1.5m above the starting point complete all as specified.
Demolition of brick work or stone masonry or precast PCC block walling built in cement mortar complete all as specified and directed.
Demolition of cement concrete (unreinforced) in ground floors and pavings n.exc 15cm thickness (below or above ground level) and disposal of unserviceable materials, debris and rubish to a distance not exc 50m as directed by Engr-in-Charge complete all as specified.
Material and labour for cement concrete (1:3:6) type C-1 using 20mm graded crushed stone aggregates as in coping incuding necessary form work complete all as specified
Material & Labour for cement concrete 1:3:6 type C-2 (using 40mm graded stone aggregate) as in surface channels and drains finished even and smooth with using extra cement including necessary form work complete all as specified and directed.
Material & Labour for preparation of new plastered surface of wall and applying two coats of cement base paint over coat of primer on plastered surfaces, complete all as specified and directed.
Supply and Fixing 110 mm bore PVC (SWR) pipe single socketed in any length with rubber ring joints fixed to walls or retaining walls as in weep holes etc complete all as specified.
Material & Labour for struck pointing to brick / concrete block walls in cement mortar 1:4 on wall surfaces complete all as specified and directed.
Material & Labour for precast cement concrete block masonry with solid block of cement concrete 1:3:6 type C-1 ( using 20 mm graded crushed stone aggregate) exc 10 cm in width and setting in CM 1:6complete all as specified and directed.
Material & Labour for Hand packing with broken stone or boulders ( any thickness) at back of the retaining walls etc and raising ( or lowering) to the required level complete all as specified and directed. .
Builders Harpal
NK CONSTRUCTION
aditya construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .