Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance N A | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹86,000
Closing Date
2 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur.
Rejuvenation of Water Bodies in Package No TN 07 58 of Kadavur Block under AGAMT II 2021-2022
2022_RDTN_238372_9
Karur District - Kadavur Block - AGAMT-II 2021-22
Open Tender
Civil Works - Others
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹86,000
Yes
IInd Floor, DRDA, Collectorate
4 Aug 2022
4 Jul 2022
2 Aug 2022
4 Jul 2022
2 Aug 2022
4 Jul 2022
8 Jul 2022
Amount
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond at Sevalur Seerangagaounder Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Sevalur Seerangagaounder Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Sevalur Seerangagaounder Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Sevalur Seerangagaounder Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at Sevalur Seerangagaounder Kulam H/O Adhanur.
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond at Palmadaipatti Vellan Kulam (246)..H/O Adhanur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Palmadaipatti Vellan Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall Palmadaipatti Vellan Kulam (246)..H/O Adhanur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Palmadaipatti Vellan Kulam H/O Adhanur.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at Palmadaipatti Vellan Kulam H/O Adhanur.
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond at manjapulipatti South Kannakkapillai Kulam (905)...H/O Thennilai.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at manjapulipatti South Kannakkapillai Kulam (905)...H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at manjapulipatti South Kannakkapillai Kulam (905).H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at manjapulipatti South Kannakkapillai Kulam (905)...H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at manjapulipatti South Kannakkapillai Kulam (905).H/O Thennilai
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond Kalapattiyan Kulam (221 ).).H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Kalapattiyan Kulam (221 ).).H/O Thennilai.H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Kalapattiyan Kulam (221 ).).H/O Thennilai.H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Kalapattiyan Kulam (221 ).).H/O Thennilai..H/O Thennilai
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment atKalapattiyan Kulam (221 ).).H/O Thennilai
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby PondOnthagoundanur Kulam (965)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Onthagoundanur Kulam (965)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Onthagoundanur Kulam (965)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Onthagoundanur Kulam (965)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment atOnthagoundanur Kulam (965)..H/O Keeranur
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond atS.Puthur Kullan Kulam (816)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at S.Puthur Kullan Kulam (816)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at S.Puthur Kullan Kulam (816)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at S.Puthur Kullan Kulam (816)..H/O Keeranur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at S.Puthur Kullan Kulam (816)..H/O Keeranur
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond atServaikaranpatti Muthuvel Madai Kulam (332/7).H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Servaikaranpatti Muthuvel Madai Kulam (332/7).H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Servaikaranpatti Muthuvel Madai Kulam (332/7).H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Servaikaranpatti Muthuvel Madai Kulam (332/7).H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at servaikaranpatti Muthuvel Madai Kulam (332/7).H/O Mullipadi
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond at Kalathu Karaipatti Vayuran Kulam (577 / 1 )..H/O Mavathur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at Kalathu Karaipatti Vayuran Kulam (577 / 1 )..H/O Mavathur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Kalathu Karaipatti Vayuran Kulam (577 / 1 )..H/O Mavathur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at Kalathu Karaipatti Vayuran Kulam (577 / 1 )..H/O Mavathur
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at Kalathu Karaipatti Vayuran Kulam (577 / 1 )..H/O Mavathur
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond ng Ghat, inlet channel and outlet channel at Servaikaranpatti Goundan Madai Kulam (459)..H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at ng Ghat, inlet channel and outlet channel at Servaikaranpatti Goundan Madai Kulam (459)..H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at ng Ghat, inlet channel and outlet channel at Servaikaranpatti Goundan Madai Kulam (459)..H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at ng Ghat, inlet channel and outlet channel at Servaikaranpatti Goundan Madai Kulam (459)..H/O Mullipadi
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at ng Ghat, inlet channel and outlet channel at Servaikaranpatti Goundan Madai Kulam (459)..H/O Mullipadi
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
a.Construction of Baby Pond at peeran madai kulam (904/3)..H/O Mavathur Kadavur Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
b.Construction of Bhathing ghat at peeran madai kulam (904/3)..H/O Mavathur Kadavur Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
c.Protection wall at Kalathu peeran madai kulam (904/3)..H/O Mavathur Kadavur Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
d.Lead Channel at peeran madai kulam (904/3)..H/O Mavathur Kadavur Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix ( one cement two sand and four aggregate)using 40mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Supplying and erecting, centering for sides and sofits including necessary supportsand strutting up to 3.29m height for plane surfaces in all floors with all cross bracings.using mildsteel sheets of size 90x60cm&10gauge stiffened welded with steel angles of size 25mmx25mmx3mm for boarding laid over silver oak countrywood joists of size 10cmx6.50cm. spaced at about 90cm. centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm. centre to centre complete complying with standard specification as directed. (Below Ground level)
e.Construction of Rivertment at peeran madai kulam (904/3)..H/O Mavathur Kadavur Union Karur District.
Rough stone Dry packing including cost andconveyance and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V KULANDAIVEL
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .