| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC PURI PURI ODISHA | PURI | ODISHA | 752001 | ₹3.7 Cr | L1 | Accepted-AOC Awarded |
| 2 | L1₹3.7 CrRejected-AOC FLAT NO 105 NIRMALYA ENCLAVE MAHURA BHUNESWAR PIN CODE 752054 | BHUNESWAR | KHORDHA | ODISHA | 752054 | ₹3.7 Cr | L1 | Rejected-AOC Cancelled |
| 3 | L2₹3.8 Cr+₹12.2 L (3.28%)Rejected-AOC | ₹3.8 Cr+₹12.2 L (3.28%) | L2 | Rejected-AOC Cancelled |
| 4 | L3₹3.9 Cr+₹16.9 L (4.56%)Rejected-AOC | ₹3.9 Cr+₹16.9 L (4.56%) | L3 | Rejected-AOC Cancelled |
| 5 | L3₹3.9 Cr+₹16.9 L (4.56%)Rejected-AOC | ₹3.9 Cr+₹16.9 L (4.56%) | L3 | Rejected-AOC Cancelled |
Tender Value
₹4.4 Cr
EMD Value
₹4.4 L
Closing Date
28 Aug 2020, 5:00 pmClosed
EE RWSS DIVISION BALASORE
O/O EE RWSS DIVISION BALASORE
RPWS WORKS
2020_RWSS_62315_1
TCN NO. 05 DT.14-08-2020
National Competitive Bid
Civil Works - Water Works
Lump-sum
330 days
BALASORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
E E, RWSS DIVISION BALASORE
₹4.4 L
Yes
O/O EE RWSS DIVISION BALASORE
9 Feb 2021
20 Aug 2020
2 Sept 2020
20 Aug 2020
28 Aug 2020
20 Aug 2020
20 Aug 2020 - 27 Aug 2020
21 Aug 2020
Amount
Laying and Jointing PVC Pipe. Heading
Supplying all materials , labour , T&P , design , drawing , soil testing etc. completein all respectfor construction of RCC Roof building pump house and construction of compound wall for pump house and construction of approach road alongwith site Development including laying , testing and commissioning of Rising main & Distribution system pipe line such as UPVC , HDPE , ASTM , GI pipe lines etc. along with required fittings & specials and construction of RCC Valve chambers, public stand posts , individual house hold connection , stand alone , storage tank , installation of Chlorination system , installation of asaubmersible pump withmotor in deep Tube well etc. ( Including supply of stand by pump motor ) , internal wiring of pump house & installation of Servo Stabilizer , External Electrification etc. as per supplied Drawing in section - 7 and detail scope of work & Technical specification , Quantity of work mentioned in section - 5 and in ( Annexure - A to G ) of village Jamunasole . All materials required shall be supplied by the contractor as per terms and condition of DTCN & all dimentions are as per supplied drawings and as per direction of Engineerr- in -charge. All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7.00 mtr and residual chlorine of 0.20 mg/ ltr without any leakage in the entire PWS System.
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing approved from(State Technical Sanction Agency ), construction,errection,testing & commissioning etc. of 100,000 ltr RCC elevated storage reservoir with necessary staging height of 15 mtr cosisting of minimum 6 nos RCC columns and circular dome using CC M-25 , ISI marked CI sluice valve, butter fly valve & it's RCC valve chambers,supplying, fitting & fixing of medium grade GI pipe of required dia & length from source to ESR , ESR to sluice valves ,for in-let,out-let,over flow & washing line, R.C.C. stair case with S.S. hand rail at dome and landing etc. and stainless steel ladder inside and outside the ESR,lightening arrester,water level indicator,CI puddle collar,0.6 m dia CI manhole cover 2 nos. at dome , RCC vent with brass jally etc. complete as per detailed scope of work & technical specification mentioned & as per terms and condition of DTCN as mentioned at Sl. No. 2.5 of Section 5 and in Annexure - H including testing of soil etc. complete as per direction of Engineer in charge.
The contractor shall maintain the PWS Project for five ( 5 ) calender years from the completion date of defect liability period of one year in such a manner that all the house hold of the PWS Scheme covered area will get ( adequate ) required quantity of supply water taking supply hour as 8 hour / day without facing any problems. The contractor shall repair and replace any types of defect arise within 24 Hrs of receipt of complain either from public or from Department. The contractor shall maintain all structure of the PWS Schemes as per terms and conditions of DTCN & Technical specification mentioned at Sl. No. 2.9 of section - 5 & in Annexure - I.
RAJESH MOHANTY
GADADHAR SETHI
RAJIB KUMAR KAR
Sunil Kumar Pradhan
HARISHANKAR DIBYARANJAN AMARDEEP
PM CONTRACTORS PRIVATE LIMITED
PURUSOTTAM BEHERA
LIZA AGENCIES
Shishir Kumar Senapati
M/S GIRIDHARI SAHOO
JRC Infra
SURYA INTERNATIONAL
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .