Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹73.8 LAccepted-AOC 327 328 III FLOOR INDRAPRASTH TOWER INDORE | INDORE | INDORE | MADHYA PRADESH | 1st | Accepted-AOC Lowest single eligible offer | |
| 2 | Rejected-Technical | - | Rejected-Technical Not meeting the eligibility criteria |
Tender Value
₹70.6 L
EMD Value
₹1.4 L
Closing Date
14 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Asst.Gen.Manager(Engg-Elect)
AAI, Calicut International Airport, Calicut Airport PO, Malappuram- 673647
Comprehensive Maintenance Contract for KONE make Escalators at Calicut International Airport for 5 years
2020_AAI_53826_1
AAI/CL/Engg(E)/2020-21/NIT-04
Open Tender
Electrical Works
Works
1826 days
Calicut Airport
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,130
AAI
₹1.4 L
23 Oct 2020
27 Jul 2020
22 Sept 2020
28 Jul 2020
14 Sept 2020
28 Jul 2020
28 Jul 2020 - 7 Aug 2020
90 days
Amount
All Inclusive Comprehensive Maintenance of complete escalator system of M/s:Kone Elevator make, including all mechanical and electrical equipments, safety control systems , supply of all required spares and components required for the system, carrying out preventive maintenance activities as per OEM recommendations and AAI maintenance schedules, attending to breakdown calls and rectifying the complaints within the time frame specified in the contract, complete as required to the satisfaction of the Engineer In Charge. (1 JOB = 1 UNIT FOR 1 YEAR) 1.a) First Year ( From 15.09.2020 to 14.09.2021)
All Inclusive Comprehensive Maintenance of complete escalator system of M/s:Kone Elevator make, including all mechanical and electrical equipments, safety control systems , supply of all required spares and components required for the system, carrying out preventive maintenance activities as per OEM recommendations and AAI maintenance schedules, attending to breakdown calls and rectifying the complaints within the time frame specified in the contract, complete as required to the satisfaction of the Engineer In Charge. (1 JOB = 1 UNIT FOR 1 YEAR) 1.b) Second Year ( From 15.09.2021 to 14.09.2022)
All Inclusive Comprehensive Maintenance of complete escalator system of M/s:Kone Elevator make, including all mechanical and electrical equipments, safety control systems , supply of all required spares and components required for the system, carrying out preventive maintenance activities as per OEM recommendations and AAI maintenance schedules, attending to breakdown calls and rectifying the complaints within the time frame specified in the contract, complete as required to the satisfaction of the Engineer In Charge. (1 JOB = 1 UNIT FOR 1 YEAR) 1.c) Third Year ( From 15.09.2022 to 14.09.2023)
All Inclusive Comprehensive Maintenance of complete escalator system of M/s:Kone Elevator make, including all mechanical and electrical equipments, safety control systems , supply of all required spares and components required for the system, carrying out preventive maintenance activities as per OEM recommendations and AAI maintenance schedules, attending to breakdown calls and rectifying the complaints within the time frame specified in the contract, complete as required to the satisfaction of the Engineer In Charge. (1 JOB = 1 UNIT FOR 1 YEAR) 1.d) Fourth Year ( From 15.09.2023 to 14.09.2024)
All Inclusive Comprehensive Maintenance of complete escalator system of M/s:Kone Elevator make, including all mechanical and electrical equipments, safety control systems , supply of all required spares and components required for the system, carrying out preventive maintenance activities as per OEM recommendations and AAI maintenance schedules, attending to breakdown calls and rectifying the complaints within the time frame specified in the contract, complete as required to the satisfaction of the Engineer In Charge. (1 JOB = 1 UNIT FOR 1 YEAR) 1.e) Fifth Year ( From 15.09.2024 to 14.09.2025)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .