Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | ₹6.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.7 L+₹44,872.92 (7.18%)Rejected-AOC | ₹6.7 L+₹44,872.92 (7.18%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.7 L+₹48,093.88 (7.70%)Rejected-AOC | ₹6.7 L+₹48,093.88 (7.70%) | L3 | Rejected-AOC L3 |
| 4 | L4₹6.7 L+₹48,692.39 (7.80%)Rejected-AOC | ₹6.7 L+₹48,692.39 (7.80%) | L4 | Rejected-AOC L4 |
| 5 | L5₹7.0 L+₹76,157.46 (12.2%)Rejected-AOC | ₹7.0 L+₹76,157.46 (12.2%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | SHAN L2 | ANI C B L1 | Sreekrishna Constructions L5 | SUBHALAL S L4 | RENJITH S I L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00building construction | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 14.53 | cum | 329.1 ₹4,782.48 | 307.05 ₹4,462.05 | 250 ₹3,633 Lowest | 330.98 ₹4,809.8 | 330.69 ₹4,805.59 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.03 | cum | 7,257.7 ₹29,255.79 | 6,771.17 ₹27,294.59 Lowest | 7,500 ₹30,232.5 | 7,299.07 ₹29,422.55 | 7,292.59 ₹29,396.43 |
| 1.00 | OD223501/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 12.46 | cum | 3,653.57 ₹45,508.87 | 3,408.65 ₹42,458.14 Lowest | 4,000 ₹49,824 | 3,674.4 ₹45,768.33 | 3,671.13 ₹45,727.6 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.1 | cum | 7,633.36 ₹54,173.96 | 6,015.97 ₹42,695.34 Lowest | 8,000 ₹56,776 | 7,676.86 ₹54,482.68 | 7,670.04 ₹54,434.27 |
| 1.00 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 9.77 | cum | 291.36 ₹2,847.75 | 271.83 ₹2,656.87 Lowest | 325 ₹3,176.55 | 293.03 ₹2,864.08 | 292.77 ₹2,861.53 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 20.52 | sqm | 697.95 ₹14,318.44 | 651.17 ₹13,358.75 Lowest | 750 ₹15,386.25 | 701.93 ₹14,400.09 | 701.31 ₹14,387.37 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 729.88 | kilogram | 102.85 ₹75,067.75 | 95.96 ₹70,038.9 Lowest | 105 ₹76,636.98 | 103.44 ₹75,498.37 | 103.35 ₹75,432.68 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.74 | cum | 9,115.88 ₹25,013.97 | 8,504.77 ₹23,337.09 Lowest | 10,000 ₹27,440 | 9,167.83 ₹25,156.53 | 9,159.69 ₹25,134.19 |
| 1.01 | 50.6.1.5:Solid block masonry using pre cast solid blocks ( Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 Part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 15.97 | cum | 6,594.58 ₹1,05,341.82 | 6,152.49 ₹98,279.88 Lowest | 7,000 ₹1,11,818 | 6,632.16 ₹1,05,942.12 | 6,626.27 ₹1,05,848.04 |
Tender Value
₹7.5 L
EMD Value
₹18,700
Closing Date
19 Nov 2025, 9:00 amClosed
Assistant Engineer
Office of the Assistant Engineer Pulimath GP
PJ No-348/26-CONSTRUCTION OF BUILDING FOR PANTHUVILA ANGANAVADI IN WARD 18
2025_LSGD_820359_2
7/ETENDER/AE/PLT/2025-26
Open Tender
Civil Works - Buildings
Item Rate
150 days
Pulimath Gramapanchayath
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,650
Yes
₹18,700
Yes
6 Aug 2026
11 Nov 2025
20 Nov 2025
11 Nov 2025
19 Nov 2025
11 Nov 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1375474.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.03 MB
Tendernotice_3.pdf
PDF • 0.03 MB
BOQ_1375474.xls
BOQ • 0.32 MB
348pag.pdf
Tender Documents • 0.13 MB
348affi.pdf
Tender Documents • 0.11 MB
348fot.pdf
Tender Documents • 0.13 MB
348sbd_merged.pdf
Tender Documents • 2.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .