Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.1 L+₹3,257.99 (0.27%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹12.4 L+₹29,994.09 (2.48%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical | - | Rejected-Technical IT,Profit and Loss account Details , Work Completed Details are Not Properly |
| Sl No | Description | Qty | Unit | GHEETHAM CONSTRAUCTION L1 | M.Pandian Contractor L3 | P Sivanantham L2 |
|---|---|---|---|---|---|---|
| 1.00Name of the Work : CONTRUCTION OF 60000 Lit Sump with 5 HP Motor at Vadaseri H/O Vadaseri | ||||||
| 2.00Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed | ||||||
| 3.00 | Hard Soil | 24.87 | m3 | 220 ₹5,471.4 Lowest | 240 ₹5,968.8 | 230 ₹5,720.1 |
| 4.00 | For SDR | 16.58 | m3 | 420 ₹6,963.6 | 350 ₹5,803 Lowest | 355 ₹5,885.9 |
| 5.00 | For MDR | 24.87 | m3 | 460 ₹11,440.2 Lowest | 550 ₹13,678.5 | 811 ₹20,169.57 |
| 6.00 | Cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by Departmental Officers. | 9.95 | m3 | 5,400 ₹53,730 | 5,100 ₹50,745 Lowest | 5,400 ₹53,730 |
| 7.00Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed . | ||||||
| 8.00 | Beyond 1.50 m & upto 4.50 m below GL | 7.02 | m3 | 8,100 ₹56,862 Lowest | 9,405 ₹66,023.1 | 8,665 ₹60,828.3 |
| 9.00 | Up to1.50 m below GL | 4.18 | m3 | 8,150 ₹34,067 Lowest | 9,350 ₹39,083 | 8,665 ₹36,219.7 |
| 10.00 | Up to 4.50 m above GL | 9.62 | m3 | 8,200 ₹78,884 Lowest | 9,410 ₹90,524.2 | 8,907 ₹85,685.34 |
Tender Value
Refer Docs
EMD Value
₹14,320
Closing Date
10 Sept 2026, 3:00 pmClosed
Block Development Officer (VP)
Block Development Officer (VP) , Thogaimalai
Construction of 60000 LTR Sump at Vadaseri in Vadaseri panchayath in Thogaimalai Block in Karur District
2026_RDTN_698684_1
Karur District Thogaimalai Block Vadaseri Panchayath Vadaseri Construction of 60000Lit Sump
Open Tender
Civil Works - Others
Item Wise
90 days
Thogaimalai Panchayat Union
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,320
Yes
11 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of the Work : CONTRUCTION OF 60000 Lit Sump with 5 HP Motor at Vadaseri H/O Vadaseri | - | - | - | - |
| 2 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earthmixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m. and as directed | - | - | - | - |
| 3 | Hard Soil | - | m3 | - | - |
| 4 | For SDR | 1 | m3 | - | - |
| 5 | For MDR | - | m3 | - | - |
| 6 | Cement concrete 1:4:8 (one cement,four sand and eight aggregate) using 40mm hard broken stone for foundation and leveling coarse including cost of all materials, mixing,placing, ramming, curing, finishing etc., complete and as directed by Departmental Officers. | 1 | m3 | - | - |
| 7 | Reinforced Cement Concrete with M30 Design Mix for the following members excluding the cost of reinforcement and fabricating, centering, shuttering and strutting charges but including the cost of all materials, mixing, placing in position, lifting, vibrating, finishing & curing, etc. complete.and as directed . | - | - | - | - |
| 8 | Beyond 1.50 m & upto 4.50 m below GL | 1 | m3 | - | - |
| 9 | Up to1.50 m below GL | 1 | m3 | - | - |
| 10 | Up to 4.50 m above GL | 1 | m3 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Techincalpitsump.pdf
Tender Documents • 0.82 MB
BOQ_839824.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .