| 1 | L1₹393.0 CrAccepted-AOC A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | ₹393.0 Cr | L1 | Accepted-AOC L- 1 bidder |
| 2 | L2₹409.9 CrRejected-Finance KPC ONE 6 3 347 9 2 DWARAKAPURI COLONY PUNJAGUTTA HYDERABAD 500082 | ₹409.9 Cr | L2 | Rejected-Finance Not L-1 Bidder |
| 3 | L3₹435.1 CrRejected-Finance 21ST FLOOR WING A GALAXY HYDERABAD KNOWLEDGE CITY RAIDURG HYDERABAD 500081 | ₹435.1 Cr | L3 | Rejected-Finance Not L-1 Bidder |
| 4 | Not Admitted-Fee/PreQual/Technical B 22 2ND FLOOR HIMALAYA HOUSE 23 K G MARG CANNAUGHT PLACE NEW DELHI 110 001 | NEW DELHI | DELHI | 110001 | - | - | Not Admitted-Fee/PreQual/Technical Others-Original Insurance Surety Bond or BG against EMD not received in this office upto the last date & time i.e. 26.12.2025 upto 1730 hrs. |
| 5 | Rejected-Technical 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | - | - | Rejected-Technical Bidder has not qualified in PQ criteria of similar nature of work, average monthly financial turnover as desired in Form-H |
| Sl No | Description | Qty | Unit | Ahluwalia Contracts (India) ltd. L1 | KPC PROJECTS LIMITED L2 | Aurobindo Realty and Infrastructure Private Limited L3 |
|---|---|---|---|---|---|---|
| 1.00Capital work Engineering, Procurement and Construction (EPC) for the project of "Development Of New Greenfield Airport at Bundi, Kota Rajasthan SH:-Construction of New Integrated Passenger Terminal Building, ATC Tower cum Technical Block, Fire Station, CISF Offices, Services Buildings & Associated Works " on the Site as set forth in Schedule A ,Scope of work as specified in Schedule-B together with provision of Project Facilities as specified in Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The project shall meet all the relevant statutory requirements i/c optimization of energy efficiency complete as required. Performance and fulfilment of all other obligations of the Contractor and ensuring compliance to all provisions contained elsewhere in the contract and in accordance with the provisions of this Tender Document and matters incidental thereto or necessary for the performance of any or all of the obligations of the Contractor under this Tender Document. Note: The bidder shall quote the offer excluding GST, ESI & PF (Employer’s Contribution). The Work includes all works like Designing, Civil Structure & Finishing Works, MEP works, Airport System, IT Works, internal Planters etc. complete in all respect required for the Operation of the respective Building: | ||||||
| 1.01 | Passenger Terminal Building including Air side & City side Kerbs, Passenger Boarding Bridges, Baggage Handling System | 1 | Job | 2,14,47,59,477 ₹214.5 Cr | 2,38,25,34,899 ₹238.3 Cr | 1,71,36,07,456.8 ₹171.4 Cr |
| 1.02 | ATC Tower, Technical Block incling Link Bridge | 1 | Job | 28,05,03,576 ₹28.1 Cr | 28,91,96,051 ₹28.9 Cr | 53,04,46,780.8 ₹53.0 Cr |
| 1.03 | Fire Station, E & M block, Services Utility Building, RCC Services Tunnel | 1 | Job | 16,00,53,811 ₹16.0 Cr | 20,59,83,244 ₹20.6 Cr | 18,55,87,945.2 ₹18.6 Cr |
| 1.04 | Drivers Canteen, CISF Office, CISF Kote, CISF Barrack, CISF Dog Kennel | 1 | Job | 5,74,84,047 ₹5.7 Cr | 5,10,94,401 ₹5.1 Cr | 4,69,18,945.2 ₹4.7 Cr |
| 1.05 | External Development works Like Water Supply line, Swerage Line, Strom Water Lines, Street lights, Facade Lighting, UGT, Roads (Airside & City side), Landscaping and Hardscaping, External Signages, Horticulture, Rain Water harvesting,
Special E & M Works like Sub Station Equipment (Transformers & DG Works), Cables, Gas based Fire Suppression system, UPS, STP, WTP, RO System, HVAC, Solar PV System, Security Equipment (tyre Killer, Boom Barrier, UVSS, Hydraulic Bollards), Waste Composter, EV Charging etc. | 1 | Job | 1,08,55,39,016 ₹108.6 Cr | 1,08,26,33,843 ₹108.3 Cr | 1,55,34,91,710.78 ₹155.3 Cr |
| 2.00Operation and All Inclusive Comprehensive Maintenance (AICMC) : | ||||||
| 2.01 | Operation & Services of all Electrical & Mechanical installation as per scope | 1 | Job | 11,61,500 ₹11.6 L | 3,30,00,000 ₹3.3 Cr | 5,86,55,190.66 ₹5.9 Cr |
| 2.02 | AICMC of all Electrical & Mechanical installation as per scope | 1 | Job | 1,87,94,696 ₹1.9 Cr | 4,70,00,000 ₹4.7 Cr | 5,86,55,190.66 ₹5.9 Cr |
| 2.03 | AICMC of all Airport System and Security System as per scope | 1 | Job | 14,10,42,081 ₹14.1 Cr | 30,00,000 ₹30 L | 19,11,81,238.32 ₹19.1 Cr |
Updated dates
Tender Value
₹384.8 Cr
EMD Value
₹11.5 Cr
Closing Date
22 Dec 2025, 5:00 pmClosed
Avadhesh Kumar Yadav
O/o ED (Engg)- NR, C-339, B-Block, 3rd Floor, RG Bhawan, Safdarjung Airport
Development of New Greenfield Airport at Bundi, Kota Rajasthan. Detailed Designing, Engineering, Procurement and Construction of New Terminal Building, ATC Tower, Fire Station, Car Parking, City Side Development and other associated works.
2025_AAI_241133_1
AAI/CHQ-NR/ENGG(C)/KOTA/TB
Open Tender
Construction Works
540 days
Kota
As per NIT
23 documents required · 23 mandatory
₹11,800
Yes
₹11.5 Cr
Yes
Delhi
5 May 2026
17 Jul 2025
26 Dec 2025
18 Jul 2025
22 Dec 2025
9 Aug 2025
18 Jul 2025 - 19 Nov 2025
25 Aug 2025
Passenger Terminal Building including Air side & City side Kerbs, Passenger Boarding Bridges, Baggage Handling System
ATC Tower, Technical Block incling Link Bridge
Fire Station, E & M block, Services Utility Building, RCC Services Tunnel
Drivers Canteen, CISF Office, CISF Kote, CISF Barrack, CISF Dog Kennel
External Development works Like Water Supply line, Swerage Line, Strom Water Lines, Street lights, Facade Lighting, UGT, Roads (Airside & City side), Landscaping and Hardscaping, External Signages, Horticulture, Rain Water harvesting, Special E & M Works like Sub Station Equipment (Transformers & DG Works), Cables, Gas based Fire Suppression system, UPS, STP, WTP, RO System, HVAC, Solar PV System, Security Equipment (tyre Killer, Boom Barrier, UVSS, Hydraulic Bollards), Waste Composter, EV Charging etc.
Operation and All Inclusive Comprehensive Maintenance (AICMC) :
Operation & Services of all Electrical & Mechanical installation as per scope
AICMC of all Electrical & Mechanical installation as per scope
AICMC of all Airport System and Security System as per scope
AICMC of all IT System as per scope
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TenderDocumentKotaTB.pdf
Tender Documents • 31.18 MB
BOQ_275259.xls
BOQ • 0.29 MB
Tenderdocument.pdf
Tender Documents • 31.18 MB
BOQ.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid