| 1 | L1₹3.7 LAccepted-AOC A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | ₹3.7 L Quoted ₹3.9 L | L1 | Accepted-AOC Award |
| 2 | L2₹4.0 LRejected-Finance VILLAGE DOGHARI PO MOVISERI TEHSIL CHACHIOT DISTT MANDI HP | ₹4.0 L | L2 | Rejected-Finance Other than Lowest |
| 3 | L3₹4.0 LRejected-Finance | ₹4.0 L | L3 | Rejected-Finance Other than Lowest |
| Sl No | Description | Qty | Unit | Manoj kumar L1 | AMAR NATH L2 | DALEEP KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required: In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works in all leads and lifts. | 1,172.71 | Kg | 163 ₹1.9 L | 166 ₹1.9 L | 170 ₹2.0 L |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts. | 22 | Sqm | 555 ₹12,210 | 558 ₹12,276 | 560 ₹12,320 |
| 3.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts. | 13.2 | Cum | 9,965 ₹1.3 L | 10,000 ₹1.3 L | 10,020 ₹1.3 L |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts. | 594 | Kg | 92 ₹54,648 | 95 ₹56,430 | 98 ₹58,212 |
Tender Value
₹4.0 L
EMD Value
₹8,000
Closing Date
19 Jan 2026, 10:00 amClosed
Executive Engineer
EE JSV Mandi
Restoration of Intake point i.e. Log Gate and RCC Wall above Gravity Main at Riyagri
2026_HPIPH_125453_1
16380-479
Open Tender
Civil Works
90 days
Mandi
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
₹8,000
7 May 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
19 Jan 2026
9 Jan 2026
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required: In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works in all leads and lifts.
Centering and shuttering including strutting, propping etc. and removal of form for all heights: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.in all leads and lifts.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering. huttering, fir ishing and reinforcement 1:1.5:3 (1) cement: 1.5 coarse sand): 3 graded stone aggregate 20 mm in all leads and lifts.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in posi and binding all complete upto plinth level. steel and Medium Tensile steel bars in all leads and lifts.
Please Enable Macros to View BoQ information
Terms and conditions
The work should be executed as per PWD/JSV specifications and to the entire satisfactions of the Engineer-in Charge.
The cement and steel shall be issued by the department from JSV Divisional Store Raghunath Ka Padhar Mandi cement @ 368/- per bag, Steel Rs. 7615/-only per qtl.
The Contractor will be fully responsible for watch and ward of material at site of work.
Nothing shall be paid for rejected/sub-standard material at site of works.
Concrete work shall be done by using vibrator and concrete mixing plant.
Crushed aggregate will be used in concrete work.
Material should be used of approved quarry.
The work should be completed within the stipulated period.
The rates Should be inclusive with GST and carriage
1% labour cess will be deducted from the bill of the contractor.
GST as applicable will be borne by the contractor.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf