Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-Finance | ₹12.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹13.8 L+₹97,846.10 (7.64%)Rejected-Finance | ₹13.8 L+₹97,846.10 (7.64%) | L2 | Rejected-Finance L2 |
| 3 | L3₹14.1 L+₹1.3 L (10.0%)Rejected-Finance | ₹14.1 L+₹1.3 L (10.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹15.3 L+₹2.5 L (19.4%)Rejected-Finance | ₹15.3 L+₹2.5 L (19.4%) | L4 | Rejected-Finance L4 |
| 5 | L5₹15.9 L+₹3.1 L (24.1%)Rejected-Finance | ₹15.9 L+₹3.1 L (24.1%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAVINDRA SINGH L2 | M/S SHIVANI ASSOCIATES L5 | M/S SHYAM CONSTRUCTION L1 | M/s Maa Sharda devi L3 | ANJANA INFRATECH L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Boundary wall of 100 mtr in length (Each pannel length 3.23 mtr) | ||||||||
| 1.01 | E/W in digging foundation as per ID SOR 2023, page no-10,ietm no-8 | 80.91 | CUM | 70 ₹5,663.7 | 75 ₹6,068.25 | 60 ₹4,854.6 Lowest | 210 ₹16,991.1 | 80 ₹6,472.8 |
| 1.02 | PCC 1:4:8 CM with stone grit in piller foundation (As per Analysis) | 7.13 | CUM | 8,500 ₹60,605 | 10,000 ₹71,300 | 7,000 ₹49,910 | 4,200 ₹29,946 Lowest | 9,900 ₹70,587 |
| 1.03 | RCC 1:1.5:3 with stone grit (As per Analysis) | 21.39 | CUM | 8,600 ₹1,83,954 | 9,800 ₹2,09,622 | 8,000 ₹1,71,120 Lowest | 8,700 ₹1,86,093 | 10,100 ₹2,16,039 |
| 1.04 | S/F Of MS Bar 8,10,12 mm dia for ring piller and beam (As per Analysis) | 1,725.77 | KG | 60 ₹1,03,546.2 | 59 ₹1,01,820.43 | 40 ₹69,030.8 Lowest | 63 ₹1,08,723.51 | 68 ₹1,17,352.36 |
| 1.05 | Ist class B/W in 1:4CM in 23cm with new brick
(As per Analysis) | 31.31 | CUM | 5,700 ₹1,78,467 | 6,300 ₹1,97,253 | 5,800 ₹1,81,598 | 5,300 ₹1,65,943 Lowest | 6,500 ₹2,03,515 |
| 2.00 | Centering and shutering for RCC works as per ID SOR 2023 page no-16, item no-4.(a) | 132.68 | SQM | 700 ₹92,876 | 680 ₹90,222.4 | 700 ₹92,876 | 450 ₹59,706 Lowest | 530 ₹70,320.4 |
| 3.00 | Cement plaster 1:4 CM upto 12 mm thick
(As per Analysis) | 297.91 | SQM | 200 ₹59,582 Lowest | 210 ₹62,561.1 | 250 ₹74,477.5 | 220 ₹65,540.2 | 240 ₹71,498.4 |
| 4.00 | Distempering with dry distemper of approved brand and manufactures two coat and of required shade on undercoated wall surface to give an even shade over .(UP.I.D. Chep. no-IX. sr no- 675 on page no- 24 ) | 297.91 | SQM | 60 ₹17,874.6 | 53 ₹15,789.23 | 50 ₹14,895.5 Lowest | 110 ₹32,770.1 | 55 ₹16,385.05 |
| 8.00Pre cast Boundary wall in 273 mtr in length & 2.3 mtr height | ||||||||
Tender Value
₹18.0 L
EMD Value
₹40,000
Closing Date
19 Aug 2026, 2:00 pmClosed
EE TWD1 GORAKHPUR
OFFICE EE TWD 1 GORAKHPUR
CONSTRUCTION OF BOUNDRY WALL OF NALKOOP INSPECTION HOUSE. IT INCLUDES 100 MTR FRONT BOUNDARY WALL OF PANEL TYPE BY RCC AND BRICK WORK AND REMAINING 273 MTR WALL OF PRECAST RCC M30 GRADE AS PER DRAWING.
2026_UPIDM_1173466_2
04/EE/2026-27 /TWD1/18-07-2026
Open Tender
Civil Works
Item Rate
60 days
GORAKHPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹40,000
19 Sept 2026
30 Jul 2026
20 Aug 2026
30 Jul 2026
19 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Boundary wall of 100 mtr in length (Each pannel length 3.23 mtr) | |||||
| 1.01 | E/W in digging foundation as per ID SOR 2023, page no-10,ietm no-8 | - | CUM | - | - |
| 1.02 | PCC 1:4:8 CM with stone grit in piller foundation (As per Analysis) | - | CUM | - | - |
| 1.03 | RCC 1:1.5:3 with stone grit (As per Analysis) | - | CUM | - | - |
| 1.04 | S/F Of MS Bar 8,10,12 mm dia for ring piller and beam (As per Analysis) | - | KG | - | - |
| 1.05 | Ist class B/W in 1:4CM in 23cm with new brick
(As per Analysis) | - | CUM | - | - |
| 2Centering and shutering for RCC works as per ID SOR 2023 page no-16, item no-4.(a) | |||||
| 3Cement plaster 1:4 CM upto 12 mm thick (As per Analysis) | |||||
| 4Distempering with dry distemper of approved brand and manufactures two coat and of required shade on undercoated wall surface to give an even shade over .(UP.I.D. Chep. no-IX. sr no- 675 on page no- 24 ) | |||||
| 8Pre cast Boundary wall in 273 mtr in length & 2.3 mtr height | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_2204371.xls
BOQ • 0.26 MB
DOCLOT2.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .