U P Irrigation Department (Mechanical)
Chief Engineer (Tubewell East)/Superintending Engineer (Tubewell) Gorakhpur/Executive Engineer(TWD) I Gorakhpur
Lost
CONSTRUCTION OF BOUNDRY WALL OF NALKOOP INSPECTION HOUSE. IT INCLUDES 100 MTR FRONT BOUNDARY WALL OF PANEL TYPE BY RCC AND BRICK WORK AND REMAINING 273 MTR WALL OF PRECAST RCC M30 GRADE AS PER DRAWING.
Gorakhpur, Uttar PradeshFinancial Evaluation 19 Sept 2026
UP
Financial Eval
UP
Financial Eval
Est₹18.0 LL1
This company