Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.6 LAccepted-Finance | ₹74.6 L | L1 | Accepted-Finance due to lower rate |
| 2 | L2₹74.6 LRejected-Finance | ₹74.6 L | L2 | Rejected-Finance due to higher rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE AS PER SUMMARY SHEET OF TECHNICAL BID EVALUATION |
| 4 | Rejected-Technical | - | - | Rejected-Technical NON RESPONSIVE AS PER SUMMARY SHEET OF TECHNICAL BID EVALUATION |
| 5 | Rejected-Technical VILLAGE AMARIYA PILIBHIT | - | - | Rejected-Technical NON RESPONSIVE AS PER SUMMARY SHEET OF TECHNICAL BID EVALUATION |
Tender Value
₹74.7 L
EMD Value
₹1.5 L
Closing Date
22 May 2026, 12:00 pmClosed
SE RED CIRCLE BAREILLY
SE RED CIRCLE BAREILLY OFFICE
Construction of a link road connecting the Haripur Power Station to the Durjanpur-Haripur-Kishanpur route (extending up to the eastern edge of the forest), Development Block Puranpur.
2026_REDUP_1146055_5
27/RED/Nivida-file Pilibhit/E-Nivida/2026-27 dated 02-04-2026
Open Tender
Civil Works - Roads
120 days
PURANPUR PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.5 L
SE RED CIRCLE BAREILLY
16 Jun 2026
7 May 2026
22 May 2026
7 May 2026
22 May 2026
7 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation in Trenches for Foundation,Pipe,Cable etc.in ordinary soil (water and or liquid mud) including lift upto 1.5m and lead upto 30m and dressing of sides and ramming of bottom and disposal of surplus earth as directed by engineer in c | 133.75 | CUM | 198.55 | ₹26,556.06 |
| 2 | Lean concrete 1:4:8 with cement fine sand and 40 mm gause Brick Ballast including all As per SI.No 275 Abutments | 11.1 | CUM | 3,924.45 | ₹43,561.4 |
| 3 | M-150 brick work in1:4 cement and fine sand mortar in foundation And plinth including all As per SI.No.305 | 20.5 | CUM | 5,225 | ₹1,07,112.5 |
| 4 | Supply of R.C.C. Hume pipe NP3 Class (incluiding cartage up to site ) S.I. No. 5 (ii)(1)900 MM Dia | 15 | RM | 4,512.5 | ₹67,687.5 |
| 5 | Laying & Fixing of 900MM Ø NP-3 Hume Pipe including all labour T&P etc complete s.i 5(a)(ii) | 15 | RM | 342 | ₹5,130 |
| 6 | Struck pointing 1:2 with cement and fine sand mortar including all labour T&P incl.etc complete As per S.I.No.574 | 55.06 | sqm | 233.7 | ₹12,867.52 |
| 7 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with as per Technical Specification Clause 301.5 | 3,155.56 | CUM | 82.84 | ₹2,61,406.59 |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. | 246 | CUM | 3,417.34 | ₹8,40,665.64 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 4.7-405(2) | 451.34 | CUM | 4,693.48 | ₹21,18,355.26 |
| 10 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 4.7-405(3) | 423.23 | CUM | 4,408.1 | ₹18,65,640.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html