| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.6 L+₹16,800 (11.9%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.7 L+₹32,600 (23.1%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹1.8 L+₹36,000 (25.5%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹1.8 L+₹39,600 (28.0%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
2 Aug 2023, 3:00 pmClosed
Chava Mahender
SMc (P AND P) CD
Fabrication and Erection of Pipeline to Supply Water for Hydro testing of New 10000 MT Ammonia Tank, FACT-CD.
2023_FACT_763697_1
04085/2023-2024/E27901
Limited
Miscellaneous Works
Item Rate
60 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM102C).
5 documents required · 5 mandatory
₹0
₹2,000
Yes
5 Aug 2023
26 Jul 2023
2 Aug 2023
26 Jul 2023
2 Aug 2023
26 Jul 2023
Fabrication and Erection of Pipeline to Supply Water for Hydro testing of New 10000 MT Ammonia Tank, FACT-CD.
Fabrication of Pipelines: Work involves : Collection / transportaion of required materials viz, pipes,fittings, studs and bolts,gaskets and all required consumables from stores. Pipelines and fittings shall be fabricated with flanges to suit the site condition. Flange joints shall be welded properly at inside and outside. Edges and weld joints shall be ground properly. Size of pipes and fittings vary from 50NB to 300NB. The pipes shall be fabricated in pieces of 1.5m/ 2m or as in full length as per site instructions.
Erection of Waterline to New Ammonia Tank Battery Limit Work involves: Collection / transportation of fabricated pipes and fittings from fabrication yard to the site. Pipelines and fittings shall be erected at site to suit the site requirement with proper gaskets and bolting and tight the flange joint to avoid any leakage. Service the line with out any leakage. Any valve in the pipeline shall be erected along with the pipes without any additional cost. The pipeline route shall be as per sketch TS/M/SK-1007 R0.
Structural works of pipe supports: Work involves: Collection / transportation of required structurals and consumables from stores to work site. Fabrication and erection of necessary pipe supports / clamps as required at site as per site instructions.
Dismantling and Transportation of Pipelines After Testing: The pipelines after testing shall be dismantled to pieces without any damage and transported to cooling tower area in PA Plant. All the pipelines and fittings shall be unloaded and neatly stacked as per site instructions. The area where pipes shall be stacked shall be cleaned and cleared off from any lying scrap debris etc.
M A Shamsudeen
BABY B
PAREETH V V
HASSAN MM
K G SIVANANDAN
MADONNA INDUSTRIES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_802852.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .