| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | ₹10.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 LRejected-AOC | ₹10.6 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | SATHEESH DAS K L3 | KARUNAKARAN K P L2 | Nikhil C L1 |
|---|---|---|---|---|---|---|
| 1.00Repair work | ||||||
| 1.00 | 13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone
additives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement
paint surface | 3,714.62 | sqm | 127.07 ₹4.7 L | 116.9 ₹4.3 L | 113.27 ₹4.2 L |
| 1.00 | 13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats | 3,484 | sqm | 135.83 ₹4.7 L | 124.96 ₹4.4 L | 122.26 ₹4.3 L |
| 1.00 | 13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work | 589.34 | sqm | 101.32 ₹59,711.93 | 93.25 ₹54,955.96 | 89.9 ₹52,981.67 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 432 | sqm | 333.56 ₹1.4 L | 306.88 ₹1.3 L | 308.23 ₹1.3 L |
Tender Value
₹11.5 L
EMD Value
₹28,726
Closing Date
26 Feb 2026, 11:00 amClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER PWD BUILDINGS SUB DIVISION THALASSERY
GENERAL-USR to Taluk supply office ,AEO Office,Fractory and boilers and special thahasildar office at Mini civil station Thalassery.-work-General Civil Work
2026_PWD_837957_1
PWD/BLDG/TR/18956/2025_5_1_1/1
Open Tender
Civil Works - Buildings
180 days
Thalassery
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹28,726
Yes
21 May 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Repair work
13.112.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shadeOld work (Two or more coats applied @ 1.43 ltr/ 10 sqm) over existing cement paint surface
13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats
13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1411423.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 1.63 MB
BOQ_1411423.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid