Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC 6 RAMESHWAR COMPLEX OPP OSCAR CITY SADHU VASVANI ROAD RAJKOT 360007 | RAJKOT | GUJARAT | 360007 | L1 | Accepted-AOC Meeting NIT criteria | |
| 2 | L2₹7.9 L+₹23,626 (3.10%)Rejected-Finance 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | L2 | Rejected-Finance Meeting NIT Criteria | |
| 3 | L3₹9.3 L+₹1.7 L (22.3%)Rejected-Finance 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L3 | Rejected-Finance Meeting NIT Criteria | |
| 4 | L4₹10.7 L+₹3.0 L (39.6%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L4 | Rejected-Finance Meeting NIT Criteria | |
| 5 | L5₹16.4 L+₹8.8 L (115.4%)Rejected-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L5 | Rejected-Finance Meeting NIT Criteria |
Tender Value
₹10.9 L
EMD Value
₹21,870
Closing Date
29 Oct 2022, 6:00 pmClosed
Sh J S Deshmukh SM (E-E)
O/o. Elect Engg Office, Rajkot Airport
Comprehensive Maintenance Contract of VRF Package, Split ACs, Water Coolers and RO Plant for 02 Years at C.E., Jamnagar.
2022_AAI_130093_1
AAI/RAJ/SM (E-E)/NIT-08/22-23
Open Tender
Electrical Works
Works
730 days
Jamnagar Airport
As per NIT
16 documents required · 16 mandatory
₹1,180
Yes
₹21,870
Yes
5 Jul 2024
4 Oct 2022
1 Nov 2022
4 Oct 2022
29 Oct 2022
4 Oct 2022
4 Oct 2022 - 27 Oct 2022
Amount
Annual Comprehensive Maintenance Contract of Blue Star Make 17 TR Capacity ductable split package AC Units (comprising of two nos 8.5 Ton Compressor in each unit) installed at Departure Lounge along with ducting, control Panel,including repair / replacement of all required hardware, spares, compressor etc required to keep the unit in working condition, including painting etc. as per tender specifications complete as required. For First Year [ 4 Nos x 12 month = 48 Each ]
Annual Comprehensive Maintenance Contract of Blue Star Make 17 TR Capacity ductable split package AC Units (comprising of two nos 8.5 Ton Compressor in each unit) installed at Departure Lounge along with ducting, control Panel, with UVGI lamp, controller, Ballast etc.including repair / replacement of all required hardware, spares, compressor etc required to keep the unit in working condition, including painting etc. as per tender specifications complete as required. For Second Year [ 4 Nos x 12 month = 48 Each ]
Annual Comprehensive Maintenance Contract of Voltas make 7.5 TR Capacity ductable split package AC Units, comprising of indoor & outdoor units with single compressor installed at security hold area alongwith ducting, control Panel etc. including repair / replacement of all required hardware, spares, compressor etc required to keep the unit in working condition, including painting etc. as per tender specifications complete as required. For First Year [ 3 Nos x 12 month = 36 Each ]
Annual Comprehensive Maintenance Contract of Voltas make 7.5 TR Capacity ductable split package AC Units, comprising of indoor & outdoor units with single compressor installed at security hold area alongwith ducting, control Panel etc. including repair / replacement of all required hardware, spares, compressor etc required to keep the unit in working condition, including painting etc. as per tender specifications complete as required. For Second Year [ 3 Nos x 12 month = 36 Each ]
Annual comprehensive maintenance contract of 1.5 TR capacity wall mounted Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer including compressor and painting etc. as per tender specifications complete as required. For First Year [ 23 Nos x 12 month = 276 Each ]
Annual comprehensive maintenance contract of 1.5 TR capacity wall mounted Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer including compressor and painting etc. as per tender specifications complete as required. For Second Year [ 23 Nos x 12 month = 276 Each ]
Annual comprehensive maintenance contract of 1.5 TR capacity wall mounted Inverter Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer excluding compressor and painting etc. as per tender specifications complete as required. For First Year [ 01 Nos x 12 month = 12 Each ]
Annual comprehensive maintenance contract of 1.5 TR capacity wall mounted Inverter Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer excluding compressor and painting etc. as per tender specifications complete as required. For Second Year [ 01 Nos x 12 month = 12 Each ]
Annual comprehensive maintenance contract of 2 TR capacity wall mounted Inverter Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer excluding compressor and painting etc. as per tender specifications complete as required. For First Year [ 03 Nos x 12 month = 36 Each ]
Annual comprehensive maintenance contract of 2 TR capacity wall mounted Inverter Split type Single phase AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer excluding compressor and painting etc. as per tender specifications complete as required. For Second Year [ 03 Nos x 12 month = 36 Each ]
Annual comprehensive maintenance of 3 TR 3 phase tower type Split AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer including compressor and painting etc. as per tender specifications complete as required. For First Year [ 03 Nos x 12 Each = 36 Each ]
Annual comprehensive maintenance of 3 TR 3 phase tower type Split AC units of all makes & models at different locations including providing all necessary consumable items, spares, voltage stabilizer including compressor and painting etc. as per tender specifications complete as required. For Second Year [ 03 Nos x 12 Each = 36 Each ]
Annual comprehensive maintenance of Water Coolers of various capacities of all makes and models at different locations including providing all necessary consumable items & spares, including compressor and painting etc. as per tender specifications complete as required. For First Year [ 04 Nos x 12 month = 48 Each ]
Annual comprehensive maintenance of Water Coolers of various capacities of all makes and models at different locations including providing all necessary consumable items & spares, including compressor and painting etc. as per tender specifications complete as required. For Second Year [ 04 Nos x 12 month = 48 Each ]
Installation, Testing, Commissioning of split type AC of 1.5 / 2.0 TR. capacity including all necessary connections, gas charging (as per requirement) and making interconnection wiring between indoor & outdoor units etc. complete as per the instructions of engineer in charge.
Dismantling of 1.5 / 2.0 TR A/C including all necessary connections, wiring between indoor and outdoor units and hand over to AAI store etc. complete as per the instructions of engineer in charge.
Providing & fixing extra refrigerant copper piping with Nitrile rubber insulation and copper cabling (2.5 sq.mm.) between indoor and outdoor units of split-type AC units (Upto 2 TR) etc. as required.
Comprehensive maintenance Contract of ION - Exchange make 200 LPH Capacity Centralized R.O. Plant including consumables like RO Filters etc. (but excluding Membrane) & spare parts. The job includes visit charges of Service personnel from the Manufacturer or Authorised Service Dealer or Specialised Agency for carrying out Minimum 01 (One) Monthly Preventive Maintenance visit for satisfactory working condition of the system (OR) Breakdown maintenance visit as and when required basis till the complete rectification of the breakdown irrespective of number of visits to attend the same breakdown, complete as required. [ 01 Nos x 20 Month = 20 Each]
Submission of water potability report (i/c. chemical and becteriaological) from govt. lab / approved govt. lab of sample collected from the location as per instruction of E.I.C. report to be submitted once in three month.
Supply of R.O. Membrane HM 4040 suitable for 200 LPH Centralized R.O.System of ION Exchange Make, complete as required.
Comprehensive Maintenance of VRF system (Make - Blue Star- Year of installation 2022) installed at arrival area,comprising of following i/c its indoor units allied accessories such as refrigerant piping,controller, ducting, i/c software,with UVGI lamp,controller, Ballast etc. complete including consumable items & spares, (attending complaint, preventive/ routine /breakdown maintenance) documentation etc as per tender specifications complete as required. Outdoor 24 HP - 1 22 HP - 2 Indoor Ductable Unit 18.0 TR - 3 Total Quantity [ 1Nos x 14 Month =14 Each ]
M K ENTERPRISES
BLUE STAR LIMITED
Manish Electricals
Zamzam Refrigeration and airconditioning
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .