| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-Finance NO 354 2ND CROSS VARADARAJNAGAR VIDYARANYAPURA POST BANGALORE 5600 097 | 5600097 | ₹22.5 L | L1 | Accepted-Finance Bid ok. |
| 2 | L2₹22.6 L+₹6,950 (0.31%)Accepted-Finance | ₹22.6 L+₹6,950 (0.31%) | L2 | Accepted-Finance Bid ok. |
| 3 | L3₹22.8 L+₹32,171.70 (1.43%)Accepted-Finance | ₹22.8 L+₹32,171.70 (1.43%) | L3 | Accepted-Finance Bid ok. |
| 4 | L4₹23.1 L+₹58,993.96 (2.62%)Accepted-Finance | ₹23.1 L+₹58,993.96 (2.62%) | L4 | Accepted-Finance Bid ok. |
| Sl No | Description | Qty | Unit | VISHWAKARMA BUILDERS & CONTRACTORS L3 | S S Builders L1 | R N COMPANY L4 | M/s Shivani Constructions L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in foundations, trenches, etc. in soft loose soils, not exceeding 1.5 meters depth including dressing of bottom and sides of trenches stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed with in a lead of 30 meters all as specified in MES SSR 2020. | 200 | Per Cum | 196 ₹39,200 | 140 ₹28,000 Lowest | 163 ₹32,600 | 182 ₹36,400 |
| 2.00 | Cement concrete 1:4:8 with stone aggregate 20 mm nominal size in foundation and plinth all as specified in MES SSR 2020. (R.M.C material) | 20 | Per Cum | 3,980 ₹79,600 | 4,288 ₹85,760 | 3,999 ₹79,980 | 389 ₹7,780 Lowest |
| 3.00 | Use & waste of forwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams and similar work; vertical or to batter fair finished surface all as specified in MES SSR 2020. | 40 | Per sqm | 240 ₹9,600 Lowest | 268 ₹10,720 | 290 ₹11,600 | 299.9 ₹11,996 |
| 4.01 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work (R:M:C) using cement content as per approved design mix, including pumping of concrete to site of laying in foundation and base slab but excluding the cost of centering, shuttering and Reinforcement + integral waterproofing FOSROC conplast X 421IC or Dr. Fixit Pidiproof LW+ @ 1.5% of cement (cement OPC 43grade) (Note: 1. The contractor shall obtain the RMC directly from any of the manufacturer or own himself here-in-after. Alternately, in case the tenderer shall be permitted by the Engineer In-charge to prepare the Ready Mix concrete at the site of the work provided the tenderer employs qualified man power, installs requisite batching plant, crane, transit mixers and other T & P etc to prepare the Ready Mix Concrete as specified here-in-after to the entire satisfaction of the Engineer In-charge. The batching plant shall be fully automatic batching plant with printing facility of capacity not less than 12 Cum/hour. The batching plant shall have 03 bins, digital display, weighing gauge with weighing accuracy of one percent with print out facility for each batch all as specified.) | 43 | Per Cum | 7,290 ₹3,13,470 | 7,090 ₹3,04,870 Lowest | 7,382 ₹3,17,426 | 7,143 ₹3,07,149 |
| 4.02 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work (R:M:C) using cement content as per approved design mix, including pumping of concrete to site of laying in slab, columns, beams and walls but excluding the cost of centering, shuttering and Reinforcement + integral waterproofing FOSROC conplast X 421IC or Dr. Fixit Pidiproof LW+ @ 1.5% of cement (cement OPC 43grade) (Note: 1. The contractor shall obtain the RMC directly from any of the manufacturer or own himself here-in-after. Alternately, in case the tenderer shall be permitted by the Engineer In-charge to prepare the Ready Mix concrete at the site of the work provided the tenderer employs qualified man power, installs requisite batching plant, crane, transit mixers and other T & P etc to prepare the Ready Mix Concrete as specified here-in-after to the entire satisfaction of the Engineer In-charge. The batching plant shall be fully automatic batching plant with printing facility of capacity not less than 12 Cum/hour. The batching plant shall have 03 bins, digital display, weighing gauge with weighing accuracy of one percent with print out facility for each batch all as specified.) | 77 | Per Cum | 8,186 ₹6,30,322 | 7,885 ₹6,07,145 Lowest | 8,108 ₹6,24,316 | 8,205 ₹6,31,785 |
| 5.00 | M/L Brick work with sub-class 'A' bricks straight or curved on plan to any radius in haft brick thick wall built all as specified in MES SSR, 2020 | 3 | Per Sm | 5,840 ₹17,520 | 6,150 ₹18,450 | 6,358 ₹19,074 | 5,799 ₹17,397 Lowest |
| 6.00 | centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chhajjas, shelves etc. inclination not exceeding 25 degree with horizontal all as sp. | 136 | Per Sm | 495 ₹67,320 | 485 ₹65,960 Lowest | 499.11 ₹67,878.96 | 527 ₹71,672 |
| 7.00 | M/L formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc. (vertical or to batter) all as specified in MES SSR, 2020. | 300 | Per Sqm | 272.88 ₹81,864 Lowest | 310 ₹93,000 | 295 ₹88,500 | 327 ₹98,100 |
| 8.00 | M/L PC plaster 12 mm thick in cement mortar 1:4, fair finished even and smooth without using extra cement, neeru finishing and waterproof complete all as specified in MES SSR, 2020. | 170 | Per sqm | 342.51 ₹58,226.7 | 331 ₹56,270 | 371 ₹63,070 | 325 ₹55,250 Lowest |
| 9.00 | Supply and fixing of Reinforcement 08 mm dia & over cut to length bent to shape required size including cranking, bending & binding with M.S. annealed wire not less than 0.9 mm dia all as specified in MES SSR 2020. | 10,000 | Per Kg | 91.1 ₹9,11,000 | 90.78 ₹9,07,800 Lowest | 92.99 ₹9,29,900 | 94.89 ₹9,48,900 |
Tender Value
₹23.0 L
EMD Value
₹46,000
Closing Date
17 Jun 2026, 5:00 pmClosed
Chief Executive officer.
229, Race Course Road, Cantonment Board office, Ambala Cantt.
As per tender documents.
2026_DGDE_771258_1
ACB/AE/TDR/2026/09
Open Tender
Civil Works - Others
Works
90 days
Ambala Cantt
As per tender documents.
3 documents required · 3 mandatory
₹500
Chief Executive officer
₹46,000
22 Jun 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
17 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches, etc. in soft loose soils, not exceeding 1.5 meters depth including dressing of bottom and sides of trenches stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed with in a lead of 30 meters all as specified in MES SSR 2020. | - | Per Cum | 100 | - |
| 2 | Cement concrete 1:4:8 with stone aggregate 20 mm nominal size in foundation and plinth all as specified in MES SSR 2020. (R.M.C material) | - | Per Cum | 100 | - |
| 3 | Use & waste of forwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundation and plinth beams and similar work; vertical or to batter fair finished surface all as specified in MES SSR 2020. | - | Per sqm | 100 | - |
| 4.01 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work (R:M:C) using cement content as per approved design mix, including pumping of concrete to site of laying in foundation and base slab but excluding the cost of centering, shuttering and Reinforcement + integral waterproofing FOSROC conplast X 421IC or Dr. Fixit Pidiproof LW+ @ 1.5% of cement (cement OPC 43grade) (Note: 1. The contractor shall obtain the RMC directly from any of the manufacturer or own himself here-in-after. Alternately, in case the tenderer shall be permitted by the Engineer In-charge to prepare the Ready Mix concrete at the site of the work provided the tenderer employs qualified man power, installs requisite batching plant, crane, transit mixers and other T & P etc to prepare the Ready Mix Concrete as specified here-in-after to the entire satisfaction of the Engineer In-charge. The batching plant shall be fully automatic batching plant with printing facility of capacity not less than 12 Cum/hour. The batching plant shall have 03 bins, digital display, weighing gauge with weighing accuracy of one percent with print out facility for each batch all as specified.) | - | Per Cum | 10 | - |
| 4.02 | Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work (R:M:C) using cement content as per approved design mix, including pumping of concrete to site of laying in slab, columns, beams and walls but excluding the cost of centering, shuttering and Reinforcement + integral waterproofing FOSROC conplast X 421IC or Dr. Fixit Pidiproof LW+ @ 1.5% of cement (cement OPC 43grade) (Note: 1. The contractor shall obtain the RMC directly from any of the manufacturer or own himself here-in-after. Alternately, in case the tenderer shall be permitted by the Engineer In-charge to prepare the Ready Mix concrete at the site of the work provided the tenderer employs qualified man power, installs requisite batching plant, crane, transit mixers and other T & P etc to prepare the Ready Mix Concrete as specified here-in-after to the entire satisfaction of the Engineer In-charge. The batching plant shall be fully automatic batching plant with printing facility of capacity not less than 12 Cum/hour. The batching plant shall have 03 bins, digital display, weighing gauge with weighing accuracy of one percent with print out facility for each batch all as specified.) | - | Per Cum | 10 | - |
| 5 | M/L Brick work with sub-class 'A' bricks straight or curved on plan to any radius in haft brick thick wall built all as specified in MES SSR, 2020 | - | Per Sm | 10 | - |
| 6 | centring and shuttering for flat surfaces such as suspended floors, roofs, landings, chhajjas, shelves etc. inclination not exceeding 25 degree with horizontal all as sp. | - | Per Sm | 10 | - |
| 7 | M/L formwork to faces of walls, retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses, etc. (vertical or to batter) all as specified in MES SSR, 2020. | - | Per Sqm | 10 | - |
| 8 | M/L PC plaster 12 mm thick in cement mortar 1:4, fair finished even and smooth without using extra cement, neeru finishing and waterproof complete all as specified in MES SSR, 2020. | - | Per sqm | 10 | - |
| 9 | Supply and fixing of Reinforcement 08 mm dia & over cut to length bent to shape required size including cranking, bending & binding with M.S. annealed wire not less than 0.9 mm dia all as specified in MES SSR 2020. | - | Per Kg | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_863689.xls
BOQ • 0.31 MB
tenderdocsumpwell.pdf
Tender Documents • 1.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .