Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC GAFOOR P | ₹3.4 L | L1 | Accepted-AOC AGREEMENT EXECUTED |
| 2 | Rejected-Technical KOTTUR KERALA | - | - | Rejected-Technical 2ND LOWEST QUOATED |
| Sl No | Description | Qty | Unit | BIJU. TV. L2 | GAFOOR. P. L1 |
|---|---|---|---|---|---|
| 1.00side protection | |||||
| 1.00 | OD358428/2025-2026: Dry rubble masonry without levelling course with good quality blasted rubble including packing to compactness and levels for road protection to withstand the dynamic load due to moving traffic including cost and conveyance of all materials, labour charges etc complete as per direction of departmental officers. | 12.2 | cum | 4,012.3 ₹48,950.06 | 3,821.24 ₹46,619.13 |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 12.3 | cum | 8,484.08 ₹1.0 L | 8,080.08 ₹99,384.98 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20 | 0.36 | cum | 10,085.59 ₹3,630.81 | 9,605.33 ₹3,457.92 |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.03 | tonne | 97,337.63 ₹2,822.79 | 92,702.51 ₹2,688.37 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1.52 | cum | 9,214.5 ₹14,052.11 | 8,775.72 ₹13,382.97 |
| 1.01 | 3.14:Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. | 288 | cum | 630.96 ₹1.8 L | 600.92 ₹1.7 L |
Tender Value
₹3.4 L
EMD Value
₹8,465
Closing Date
11 Nov 2025, 6:00 pmClosed
ASSISTANT ENGINEER LID EW
SSISTANT ENGINEER LID EW NOCHAD GP
A n n u a l P l a n - 2 0 2 5 - 2 6 N O C H A D G P PARACHALIL ROAD REPAIR-248/26- General Civil Work
2025_LSGD_818888_1
AE/TN/1/25-77
Open Tender
Civil Works - Roads
90 days
NOCHAD GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,465
Yes
22 Apr 2026
4 Nov 2025
13 Nov 2025
4 Nov 2025
11 Nov 2025
4 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
sbdparachalil2.pdf
Tender Documents • 1.68 MB
BOQ_1372562.xls
BOQ • 0.30 MB
nitparachalil2.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid