Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.8 L+₹3,494.62 (0.93%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.8 L+₹8,154.10 (2.17%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.9 L
EMD Value
₹7,766
Closing Date
24 Sept 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
CONSTRUCTION OF TILE PATH AT DIFFERENT SPOTS AT YEMBERZALWARI BALA (PYT HALQA YEMBERZALWARI) BLOCK TUJJER SHARIEF UNDER ADP(PRI) 2026-27
2026_RDPR_325127_7
229/2026-27 Dated 18-09-2026 (RETENDER)
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Executive Engineer REW Baramulla
₹7,766
25 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
24 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of dry stone soling hand packed under floors or foundations incl all carriages | 20.13 | CUM | 1,200 | ₹24,156 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size) | 25.03 | CUM | 5,733.2 | ₹1,43,502 |
| 3 | Providing and laying 50mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 244.77 | SQM | 760 | ₹1,86,025.2 |
| 4 | Carriage of Materials Sand/Aggregate for an avg lead of 30 kms | 33.79 | CUM | 520 | ₹17,570.8 |
| 5Carriage by H/L for 200 mtrs | |||||
| 5.1 | sand/agg | 33.79 | CUM | 331.7 | ₹11,208.14 |
| 5.2 | Tiles | 7,975 | NO | 0.39 | ₹3,086.33 |
| 5.3 | c)Cement | 5.65 | TON | 211 | ₹1,192.15 |
| 6 | PROVISION FOR CIB AND PHOTOS | 1 | JOB | 1,550 | ₹1,550 |
stage.html
html • 0.02 MB
finance_1097842.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_1097842.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .