Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.2 Cr | L1 | Accepted-AOC Qualified |
| 2 | L2₹1.2 Cr−₹3.2 L (2.58%)Rejected-Finance | ₹1.2 Cr−₹3.2 L (2.58%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹1.2 Cr+₹74,160 (0.60%)Rejected-Finance 254 DOON VIHAR JAKHAN RAJPUR ROAD DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.2 Cr+₹74,160 (0.60%) | L3 | Rejected-Finance Disqualified |
| 4 | L4₹1.3 Cr+₹6.4 L (5.21%)Rejected-Finance 379 MOHIT NAGAR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.3 Cr+₹6.4 L (5.21%) | L4 | Rejected-Finance Disqualified |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
7 Sept 2019, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Construction Circle UKPJN Dehradun
Part Sewerage System in Abhishek Nagar and Indu Enclave in Haridwar Town
2019_MDPEY_19842_1
Letter No. 5718/NIVIDA/512 dated 21-08-2019
Open Tender
Civil Works
Item Rate
270 days
Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer PIU AMRUT UKPJN
₹2.9 L
Dehradun
3 Jan 2020
22 Aug 2019
11 Sept 2019
23 Aug 2019
7 Sept 2019
29 Aug 2019
27 Aug 2019
Amount
Dismantling of following type of road surfaces for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials.
CC road
Excavation of earth for the following depths below G.L. for laying and jointing of sewers in soil mixed with shingle, bajri etc. including excavation for joints pits, trimming, dressing, levelling, refilling of trenches in 15 cm layers, watering & ramming the same and disposal of surplus earth & other dismantled materials upto a distance of 50 m from the centre of the trenches.
Provide & fix open timbering (covering1/3rd of surface area by planks), in trenches for the depth upto 3 mt. Below ground level consisting of 40mm thick approved country wood planks for poling board 125mm × 75mm Indian Salwood walers and 100mm dia Sal ballies for strurts at 1.50m c/c including removal after laying of sewer both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
Provide & fix close timbering in trenches for the depth from 3-6 mt. Below ground level consisting of 50mm thick country wood planks 150mmx75mm indian salwood walers and 125mm dia sal ballie for strurts at 1.50m percent including removal after laying of sewer(both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.
Providing and laying of granual bedding with well graded crushed rock or gravel mixed with size upto 20mm including supply of all material,labour,T&P etc. required for proper completion of work.
Lowering in trenches, aligning, laying & jointing of RCC pipes NP3 class (with s/s ends) as per IS: 458 - 1988 (Amended up to date) with Rubber gaskets (EPDM/SBR) including cost of all jointing materials, testing, commissioning etc, complete as per specifications and/or as directed by Engineer. etc. jointed with stiff mixture of cement mortar in the proportion of1:2 (1 cement : 2 fine sand) including testing of joints etc.
200 mm dia NP3 S/S
0.00m - 1.50 m B.G.L.
1.50 m - 3.00 m B.G.L.
3.00 m - 4.50 m B.G.L.
Constructing Brick Masonry Manhole of various dia and depth as per IS :4111 par1( latest ammendment) in FPS brick class designation M-100 in Cement Mortar 1:5 (1 cement : 5 coarse sand) including nside and outside 15mm thick plastering in cement mortar 1:3(1 cement : 3 coarse sand) finished with a floating coat of neat cement inside only. The work includes excavation, dewatering, planking, strutting etc. refilling, disposal of surplus earth with all lift and lead of 50m, Including construction of concrete base with PCC 1:4:8 (1 cement : 1 coarse sand : 4 stone aggregate 40mm nominal size), preparation of channal up to the height of'the'pipe and benching in PCC 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20mm nominal size) including neat cement finished, suitable connection of inlet & outlet pipes, testing (watertightness} of manhole, curing etc. complete as per specification and drawing and as per entire satisfaction of Engineer-in-Charge (the depth of manhole will be measured from the invert of the pipe to top of the manhole cover).
900 mm internal diameter at bottom, 1.65 m depth
1200 mm internal diameter at bottom, 2.30m depth
1500 mm internal diameter at bottom, 3.00m depth
Provide all materials, labour T&P etc. and construct masonary manhole shaft to regulate excess or less height of following size of slab type manholes.
900 mm internal diameter at bottom, 1.65 m depth
1200 mm internal diameter at bottom, 2.30m depth
1500 mm internal diameter at bottom, 3.00m depth
Provide all materials, labour T&P etc. and construct sewer connecting chamber of following sizes as per design and specification.
0.60 x 0.60 x .80 m depth
Provide all materials, labour T&P etc. and construct House connecting chamber shaft to regulate excess or less height of following size of slab type manholes.
0.60 x 0.60 x .80 m depth
Reinstatement of following types of road for sewers, manholes, sewer connecting chambers etc.
Excavation of earth in building work
Laying of PCC 1:4:8 in base concrete including all material labour T&P etc.
Laying of PCC 1:1.5:3 including all material labour T&P etc.
Provision for shifting of house connecting pipe line coming in the alignmen of sewer and in chambers including all materials, labour etc. comp. and including balling out of water from trenches.
Provision for making of connection of proposed sewer to existing sewer including making of holes in the walls and repairing the same with the new brick work as may be required for proper complete connection including clearing of existing sewer and manhole
Provision for shifting and reinstatement of domestic sewage supply line upto 250 mm dia in the alignment including all material, labour and T&P etc.
Provision for crossing of Nallah / drain and diversion of water and dismantling and Reinstatement of the same during execution of the work.
Supply of all material, labour and T&P to provide the barricading along trench during excavation and laying of pipe with eucalyptus ballies of 100mm dia in horizontal section in two rows and vertical post of 125 mm dia at 2 m C/C fastened with Nariyal rope including provision of cacution board.
Cartage and recarting of excavated earth from site to other place due narrow space in lanes including its proper staking, to reduce the earth load on trenches and making arrangment of path for local residents as per direction of engineer incharge by head load on an average distance 60 M assuming 30% of total excavated earth
Disposal of excavated excess earth away from the site including conveyance of material up to an average lead of 8 Km away from the site and corresponding required lift, loading, unloading etc complete as directed by the engineer-in-charge.
SAKLA NAND LAKHERA
M.R.ENGINEERS AND CONTRACTORS
Ms Ankita Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .