| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | ₹2.1 L | L1 | Accepted-AOC Lowest Offer |
| 2 | L2₹2.2 LRejected-Finance 4 14 A LEMBALAKUDDI PUDUKKOTTAI DISTRICT | PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | ₹2.2 L | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹2.2 LRejected-Finance | ₹2.2 L | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹2.3 LRejected-Finance | ₹2.3 L | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹2.5 LRejected-Finance | ₹2.5 L | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | R.GANESAN L2 | TR CONSTRUCTIONS L4 | SRI PONGUZHALI CONSTRUCTION L5 | kanagaraj L1 | RAJ BUILDERS L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00BOQ | ||||||||
| 1.01 | SUPPLY AND FIXING OF FENCING STONE POST SIZE 4" X 5", 7’ LONG AND FIXING THE POSTS AT VARIOUS PLACES ALONG BOUNDARY AREA BY EXCAVATING OF SIZE 0.3 X 0.45 X 0.45 MTR AND FIX THE POSTS WITH PCC 1:5:10, INCLUDING CURING, TRANSPORTATION OF POST AND OTHER MATERIALS ETC., COMPLETE AS DIRECTED BY ENGINEER IN – CHARGE. | 55 | NO | 630 ₹34,650 | 640 ₹35,200 | 600 ₹33,000 | 550 ₹30,250 Lowest | 700 ₹38,500 |
| 1.02 | SUPPLY AND FIXING OF CHAIN LINK FENCE 3" SQUARE OF 12 GAUGE AND TIE UP IN POSITION INCLUDING NECESSARY 18 GAUGE BINDING WIRE, ETC., COMPLETE. | 320 | SQM | 207 ₹66,240 Lowest | 210 ₹67,200 | 300 ₹96,000 | 250 ₹80,000 | 210 ₹67,200 |
| 1.03 | REMOVING THE EXISTING GI BARBED WIRE AND RE FIXING THE SAME AND TIE IN POSITION WITH GI BINDING WIRE INCLUDING LABOUR AS DIRECTED BY ENGINEER - IN CHARGE. | 400 | RMR | 54 ₹21,600 | 55 ₹22,000 | 20 ₹8,000 | 15 ₹6,000 Lowest | 60 ₹24,000 |
| 1.04 | SUPPLY AND LAYING OF 18GAUGE GI BARBED WIRE FENCING AS DIRECTED. | 300 | RMR | 45 ₹13,500 Lowest | 47 ₹14,100 | 60 ₹18,000 | 50 ₹15,000 | 50 ₹15,000 |
| 1.05 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL AND STRUCTURAL WORKS – HELPER FOR MASON / PLUMBER / CARPENTER / FITTER / WELDER, ETC., | 20 | MD | 1,170 ₹23,400 | 1,200 ₹24,000 | 1,150 ₹23,000 | 1,050 ₹21,000 | 1,000 ₹20,000 Lowest |
| 1.06 | HIRING OF JCB BACK HOE EXCAVATOR/LOADER WITH OPERATOR FOR ALL TYPES OF CIVIL WORKS. | 30 | HR | 900 ₹27,000 Lowest | 950 ₹28,500 | 1,100 ₹33,000 | 900 ₹27,000 Lowest | 1,000 ₹30,000 |
| 1.07 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 5 | CUM | 270 ₹1,350 | 275 ₹1,375 | 250 ₹1,250 | 225 ₹1,125 | 200 ₹1,000 Lowest |
| 1.08 | CEMENT CONCRETE M20 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FOOTING, RAFT, PLINTH BEAM, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 5 | CUM | 4,300 ₹21,500 | 4,400 ₹22,000 | 4,200 ₹21,000 | 4,000 ₹20,000 | 3,500 ₹17,500 Lowest |
| 1.09 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 20 | SQM | 650 ₹13,000 | 670 ₹13,400 | 600 ₹12,000 | 550 ₹11,000 | 500 ₹10,000 Lowest |
Tender Value
Refer Docs
Closing Date
25 Feb 2026, 3:00 pmClosed
General Manager (Projects and Energy)
PMD Office, TNPL Unit I, Kagithapuram.
Providing chain link fencing in the back side of the security barrack near railway gate at TNPL Unit I
2026_TNPL_658900_1
TNPL/PMD/CIV/UNIT I/252613007490
Open Tender
Civil Works
Item Rate
30 days
TNPL Unit I, Kagithapuram, Karur district
Not Applicable
1 document required · 1 mandatory
₹0
Exempted
3 Mar 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
25 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BOQ | |||||
| 1.01 | SUPPLY AND FIXING OF FENCING STONE POST SIZE 4" X 5", 7’ LONG AND FIXING THE POSTS AT VARIOUS PLACES ALONG BOUNDARY AREA BY EXCAVATING OF SIZE 0.3 X 0.45 X 0.45 MTR AND FIX THE POSTS WITH PCC 1:5:10, INCLUDING CURING, TRANSPORTATION OF POST AND OTHER MATERIALS ETC., COMPLETE AS DIRECTED BY ENGINEER IN – CHARGE. | 55 | NO | - | - |
| 1.02 | SUPPLY AND FIXING OF CHAIN LINK FENCE 3" SQUARE OF 12 GAUGE AND TIE UP IN POSITION INCLUDING NECESSARY 18 GAUGE BINDING WIRE, ETC., COMPLETE. | 320 | SQM | - | - |
| 1.03 | REMOVING THE EXISTING GI BARBED WIRE AND RE FIXING THE SAME AND TIE IN POSITION WITH GI BINDING WIRE INCLUDING LABOUR AS DIRECTED BY ENGINEER - IN CHARGE. | 400 | RMR | - | - |
| 1.04 | SUPPLY AND LAYING OF 18GAUGE GI BARBED WIRE FENCING AS DIRECTED. | 300 | RMR | - | - |
| 1.05 | PROVIDING MANPOWER ASSISTANCE FOR ATTENDING MISCELLANEOUS CIVIL AND STRUCTURAL WORKS – HELPER FOR MASON / PLUMBER / CARPENTER / FITTER / WELDER, ETC., | 20 | MD | - | - |
| 1.06 | HIRING OF JCB BACK HOE EXCAVATOR/LOADER WITH OPERATOR FOR ALL TYPES OF CIVIL WORKS. | 30 | HR | - | - |
| 1.07 | EARTH WORK EXCAVATION IN ALL SOILS AND SUB SOILS EXCLUDING ROCK INCLUDING BACKFILLING IN SIDES OF FOUNDATIONS AND BASEMENT, WATERING, CONSOLIDATION, INCLUDING DEWATERING WHEREVER NECESSARY, ETC., AND DISPOSING OFF THE SURPLUS EARTH WITHIN A LEAD OF 40 MTRS AS DIRECTED IN DEPTH FROM GROUND LEVEL TO -2 MTR. | 5 | CUM | - | - |
| 1.08 | CEMENT CONCRETE M20 USING 20MM SIZE BLUE GRANITE AGGREGATE FOR ALL CEMENT CONCRETE ITEMS SUCH AS FOOTING, RAFT, PLINTH BEAM, ETC., EXCLUDING SHUTTERING BUT INCLUDING LEVELLING, CURING, ETC., COMPLETE BELOW GROUND LEVEL AND UPTO FFL. | 5 | CUM | - | - |
| 1.09 | FORM WORK - WROUGHT AND PUT UP WITH GOOD QUALITY MARINE GRADE PLYWOOD / STEEL SHUTTERING FOR ALL TYPES OF SHUTTERING WORKS LIKE FOOTING, RAFT, PLINTH BEAM, ETC., AS "PLASTER FREE FINISH" BELOW GROUND LEVEL AND UPTO FFL. | 20 | SQM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_790508.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Biddocument_252613007490.pdf
Tender Documents • 1.94 MB
BOQ_790508.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].