| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 CrAccepted-AOC 2 560 GOMTI NAGAR VIRAM KHAND LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹23.8 Cr Quoted ₹24.0 Cr | L1 | Accepted-AOC This is L1 |
| 2 | L2₹26.3 Cr+₹2.3 Cr (9.46%)Rejected-Finance | ₹26.3 Cr+₹2.3 Cr (9.46%) | L2 | Rejected-Finance REJECTED DUE TO HIGHER RATE QUOTED |
| 3 | L3₹26.8 Cr+₹2.8 Cr (11.6%)Rejected-Finance | ₹26.8 Cr+₹2.8 Cr (11.6%) | L3 | Rejected-Finance REJECTED DUE TO HIGHER RATE QUOTED |
| 4 | L4₹26.8 Cr+₹2.8 Cr (11.9%)Rejected-Finance GULALI VATIKA GEETA VATIKA SHAHPUR DISTRICT GORAKHPUR | ₹26.8 Cr+₹2.8 Cr (11.9%) | L4 | Rejected-Finance REJECTED DUE TO HIGHER RATE QUOTED |
| 5 | L5₹26.9 Cr+₹2.9 Cr (12.0%)Rejected-Finance | ₹26.9 Cr+₹2.9 Cr (12.0%) | L5 | Rejected-Finance REJECTED DUE TO HIGHER RATE QUOTED |
| Sl No | Description | Qty | Unit | M/s Vishal Construction L4 | SIDDHARTH CONSTRUCTION L5 | JAGDISH PRASAD SHUKLA L3 | AMBE INFRAPROJECTS PRIVATE LIMITED L1 | M/s Nirbhay Constructions L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Embankment with Local Earth:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 21,500 | Cum | 124 ₹26,66,000 | 124 ₹26,66,000 | 124 ₹26,66,000 | 110 ₹23,65,000 Lowest | 110 ₹23,65,000 Lowest |
| 2.00 | Embankment with Carted Earth:- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(using carted earth from 3 km) | 5,309.37 | Cum | 228 ₹12,10,536.36 | 229 ₹12,15,845.73 | 229 ₹12,15,845.73 | 196 ₹10,40,636.52 Lowest | 220 ₹11,68,061.4 |
| 3.00 | Widening of Existing Road:- Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 14,126.85 | Cum | 56 ₹7,91,103.6 | 57 ₹8,05,230.45 | 57 ₹8,05,230.45 | 49 ₹6,92,215.65 Lowest | 50 ₹7,06,342.5 |
| 4.00 | Embankment with excavated Earth from Drain/Widening:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 14,126.85 | Cum | 68 ₹9,60,625.8 | 69 ₹9,74,752.65 | 69 ₹9,74,752.65 | 58 ₹8,19,357.3 Lowest | 60 ₹8,47,611 |
| 5.00 | G.S.B.grade 1:- Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 10,750 | Cum | 4,960 ₹5,33,20,000 | 4,962 ₹5,33,41,500 | 4,900 ₹5,26,75,000 | 4,500 ₹4,83,75,000 Lowest | 4,900 ₹5,26,75,000 |
| 6.00 | W.M.M.:- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,470 | Cum | 5,880 ₹2,04,03,600 | 5,881 ₹2,04,07,070 | 5,850 ₹2,02,99,500 | 5,300 ₹1,83,91,000 Lowest | 5,700 ₹1,97,79,000 |
| 7.00 | P.Q.C. M35 Grade:- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (M35) | 4,101.9 | Cum | 10,850 ₹4,45,05,615 | 10,862 ₹4,45,54,837.8 | 10,862 ₹4,45,54,837.8 | 10,020 ₹4,11,01,038 Lowest | 10,500 ₹4,30,69,950 |
| 8.00 | Prime Coat:- Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 74,690 | Sqm | 42 ₹31,36,980 | 42 ₹31,36,980 | 42 ₹31,36,980 | 35 ₹26,14,150 Lowest | 40 ₹29,87,600 |
| 9.00 | D.G.B.M. Grade - 2:- Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,878.48 | Cum | 12,680 ₹6,18,59,126.4 | 12,684 ₹6,18,78,640.32 | 12,650 ₹6,17,12,772 | 11,500 ₹5,61,02,520 Lowest | 12,500 ₹6,09,81,000 |
| 10.00 | Tack Coat:- Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 75,635 | Sqm | 12 ₹9,07,620 | 12 ₹9,07,620 | 12 ₹9,07,620 | 10 ₹7,56,350 Lowest | 11 ₹8,31,985 |
Tender Value
₹26.5 Cr
EMD Value
₹39.8 L
Closing Date
29 Jan 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Bahraich-Shrawasti Circle, P.W.D., Bahraich
WIDENING AND STRENGTHENING OF RAIPUR TEPRAHA KHAS TO TEDIYA SHANKARPUR INTHA IMAMGANJ (ODR) IN DISTRICT BAHRAICH FINANCIAL YEAR 2025-26 (VIDHAN SABHA-NANPARA) WITH FIVE YEAR MAINTENANCE
2026_CEDPW_1108662_1
194 /8 Kam/E-Tendering/BRH-SWT Circle/2025-26 Dated - 14-01-2026
Open Tender
Civil Works - Roads
Item Rate
450 days
Bahraich
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,154
₹39.8 L
Yes
Bahraich
4 Jun 2026
23 Jan 2026
29 Jan 2026
23 Jan 2026
29 Jan 2026
23 Jan 2026
24 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Embankment with Local Earth:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 21,500 | Cum | - | - |
| 2 | Embankment with Carted Earth:- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.(using carted earth from 3 km) | 5,309.37 | Cum | - | - |
| 3 | Widening of Existing Road:- Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 14,126.85 | Cum | - | - |
| 4 | Embankment with excavated Earth from Drain/Widening:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 14,126.85 | Cum | - | - |
| 5 | G.S.B.grade 1:- Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 | 10,750 | Cum | - | - |
| 6 | W.M.M.:- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 3,470 | Cum | - | - |
| 7 | P.Q.C. M35 Grade:- Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (M35) | 4,101.9 | Cum | - | - |
| 8 | Prime Coat:- Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. | 74,690 | Sqm | - | - |
| 9 | D.G.B.M. Grade - 2:- Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. | 4,878.48 | Cum | - | - |
| 10 | Tack Coat:- Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 75,635 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
Bid_Document_Part_1SBD.pdf
Tender Documents • 0.47 MB
Addendum_to_Bid_DocumentSBD.pdf
Tender Documents • 0.18 MB
Bid_Document_Part_2SBD.pdf
Tender Documents • 0.22 MB
BOQ_2046925.xls
BOQ • 0.26 MB
194corr7.pdf
PDF • 0.63 MB
194Corr6.pdf
PDF • 0.57 MB
194Corr5.pdf
PDF • 0.47 MB
194_Corr4.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .