Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹91.5 LAccepted-Finance | ₹91.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹10.1 L−₹81.4 L (89.0%)Accepted-Finance | ₹10.1 L−₹81.4 L (89.0%) | L2 | Accepted-Finance L2 |
| 3 | L3₹10.3 L−₹81.2 L (88.7%)Accepted-Finance | ₹10.3 L−₹81.2 L (88.7%) | L3 | Accepted-Finance L3 |
Tender Value
₹8.2 L
EMD Value
₹20,700
Closing Date
11 Jun 2026, 5:00 pmClosed
Executive Engineer PMU Ekm
Office of the Executive Engineer Project Management Unit Power House Road Ernakulam
Reconductoring of HT OH with ABC
2026_KSEB_849556_1
EP-12/2026-27/PMU-EKM
Open Tender
Electrical Works
Percentage
90 days
Panangad
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,100
₹20,700
22 Jun 2026
7 May 2026
17 Jun 2026
7 May 2026
11 Jun 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | - | No | - | - |
| 2 | Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials. | - | Km | - | - |
| 3 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | - | No | 1 | - |
| 4 | Fitting and erecting one HT PSC Single Pole in position for ABC work etc. digging and back filling pit in ordinary soil (as per standards), with out fitting V cross arm&F.bracket. The actual work key no.112 amount 2178/-. The rate of fitting V-cross arm(rs.320)&F-bracket(rs.99) rate is deducted from key no 112(ie.2178-419=1759) | - | E | - | - |
| 5 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | - | No | - | - |
| 6 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. | - | No | - | - |
| 7 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | - | No | 1 | - |
| 8 | Additional rate for excavation of Pit for A type pole in Hard Laterite. | - | No | - | - |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | - | No | 1 | - |
| 10 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | - | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Tenderdoc.pdf
Tender Documents • 1.67 MB
BOQ_1435525.xls
BOQ • 0.34 MB
Datecorrigendum1.pdf
PDF • 0.51 MB
Datecorrigendum.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .