| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance C 5 2ND FLOOR R K TOWER PLOT NO 21 22 SECTOR 04 VAISHALI GHAZIABAD 201012 MOB 8377811395 | Admitted-Finance |
| 2 | Admitted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
22 Jun 2020, 11:00 amClosed
A K Jha
AK Jha Deputy General Manager (Technical) National Highway and Infrastructure Development Corporation Ltd. PTI Building, 3rd Floor, 4, Parliament Street, New Delhi-110001
Consultancy Services for AE for Supervision of Cons. of 1. 2 lane with hard shoulder of Kohima-Jessami Road from km 76.320 to km 98.380 Pkg IV (ii) from km 98.380 to km 120.367 (Nagaland/Manipur Border) in the state of Nagaland Pkg V
2020_NHIDC_556185_1
NHIDCL/Nagaland/AE/KJ/45
Open Tender
Consultancy
Item Rate
2373 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
MD NHIDCL
Exempted
NHIDCL HQ
14 Aug 2020
22 Apr 2020
23 Jun 2020
22 Apr 2020
22 Jun 2020
15 Jun 2020
22 Apr 2020 - 25 May 2020
25 May 2020
Amount
Remuneration for Local Staff
Team Leader Cum Senior Highway Engineer (1 No)
Resident cum Highway Engineer(1 No)
Bridge/Structural Engineer (1 No)
Senior Quality Cum Material Expert (1 No)
Senior Pavement Specialist
Road Safety Expert
Sub-Professional Staff
Survey Engineer (2 nos during Construction Period)
Quantity Surveyor (2 nos during Construction Period and 1 no during Maintenance Period)
Lab Technician (2 nos during Construction Period)
Support Staff (inclusive of per diem allowance)
Office Manager (1 No)
Accountant Cum Cashier (1 No)
Steno cum Computer operator (1 No)
Office Boy (1 No)
Transportation : The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
Scorpio or equivalent 4x4 vehicle(not more than 3 years old) (3 nos during Construction Period and 1 nos during Maintenance Period.)
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff. The employer may require the key personnel to visit the Employer's Site Offices/Regional Office. The quoted amount against remuneration should include travel fare for 20 round trip to Employer's Head Office and 20 round trip to Employer's regional office. (including Hotel Charges,travel costs etc. complete)
Office Rent (Fixed Costs) The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc.
Minimum 200 sqm area of Office shall be rented for Construction Period & Defect Liability Period(Maintenace Period)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2 external & 10 internal lines), photocopier (15ppm, 12000 copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Reports and Document Printing
Monthly reports (Design and Construction) rate as per Copy: [Total Number of Copies are 234 = No. of Report (78) x No.of Copies for Report (3)]
Half yearly Reports, rate as per Copy: [Total Number of Copies are 9 = No. of Report (3) x No.of Copies for Report (3)]
Various other reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment (Rate as per 1 Km)
Surface defects detection and roughness measurement using Network Survey Vehicle [Total Quantity is 440 = No. of time survey to be conducted (10) x Km (44)]
Pavement strength measurement using FWD [Total Quantity is 264 = No. of time survey to be conducted (6) x Km (44)]
Bridge inspection using Mobile Bridge Inspection Unit [Total Quantity is 440 = No. of time survey to be conducted (10) x Km (44)]
Road signs inspection using Retro Reflectometer [Total Quantity is 440 = No. of time survey to be conducted (10) x Km (44)]
Contigencies A fixed amount of Indian Rupees ONE MILLION (Rs 10 Lack) shall be included in the Financial Proposal
Theme Engineering Services Pvt Ltd
Geo Designs and Reserch Pvt. Ltd.
Chaitanya Projects Consultancy Pvt. Ltd.
SA Infrastructure Consutants Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .