| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC | ₹40.7 L | L1 | Accepted-AOC Decision |
| 2 | L2₹40.8 LRejected-Finance | ₹40.8 L | L2 | Rejected-Finance Decision |
| 3 | Rejected-Technical SARJOMGUDU CHAIBASA WEST SINGHBHUM | CHAIBASA | WEST SINGHBHUM | JHARKHAND | - | - | Rejected-Technical Decesion |
| 4 | Rejected-Technical | - | - | Rejected-Technical Decision |
| 5 | Rejected-Technical STATION ROAD CHAIBASA WEST SINGHBHUM | - | - | Rejected-Technical Decision |
Tender Value
₹40.8 L
EMD Value
₹82,000
Closing Date
22 Dec 2025, 5:00 pmClosed
E.E, MINOR IRRIGATION DIVISION CHAIBASA
MINOR IRRIGATION DIVISION, CHAIBASA
CONSTRUCTION OF PCC ROAD FROM VILLAGE-PADAMPUR JONDOKO SINKUS HOUSE TO MASURIBAI IN PANCHAYAT SIRINGSIYA UNDER BLOCK TONTO, DIST-WEST SINGHBHUM, JHARKHAND
2025_WRD_107880_1
MID/CHAIBASA/F2-12/2025-26DMFT
Open Tender
Civil Works
120 days
TONTO
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹82,000
Yes
29 Apr 2026
16 Dec 2025
24 Dec 2025
16 Dec 2025
22 Dec 2025
16 Dec 2025
Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lift leveling ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. SOR. Item number - 5.1.1+5.1.2 BCD
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Grading - I Material.SOR. Item number Part-4.01 B (i) RCD
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Grading - II Material.SOR. Item number Part-4.01 B (ii) RCD
Providing and laying in position cement concret of specified grade excluding the cost of centring and shuttering -All work upto plinth level:-(1:1.5:3(1cement :1.5coarse sand (zone-III):3 graded stone aggregate 20mm nominal size) Sor item No Part -5.3.1.1 BCD
Centring and shuttering including strutting ,proping etc and removal of form for foundation ,footing ,bases of columns ,etc for mass concrete SOR item No Part - 5.3.17.1 BCD
Filling in foundation trenches or in plinth in layer not exceeding 150mm thick,well watered rammed fully compacted and fine dressed with earth obtained after cutting with lead of 50m and lift of 1.5mall completed as per direction of E/I(mode of measurement compacted volume). SOR item No Part-5.1.8 BCD
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royality and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) SOR item No-5.1.10 BCD
Supplying laying boulder in rock toe,heel trenches of the dam as per design, drawing including the cost of materials royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.SOR item No Part A -5.6.4
Providing and laying in position cement concret of specified grade excluding the cost of centring and shuttering -All work upto plinth level:-(1:2:4(1cement :2coarse sand (zone-III):4 graded stone aggregate 20mm nominal size) SOR item No -5.3.1.2 BCD
Providing Random Rubble masonary in cement mortar (1:4) in foundation and plinth with hammer dressed stone of less than 0.03M3 in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening ,raking out joints to 20mm depth ,curing ,taxes and royality all complete as per drawing and technical specifications and direction of E/I.SOR item No Part A -5.2.28
Providing Random Rubble masonary in cement mortar (1:4) in Superstructure with hammer dressed stone of less than 0.03M3 in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening of materials, Scaffolding, raking out joints to 20mm depth ,curing ,taxes and royality all complete as per drawing and technical specifications and direction of E/I.SOR item No Part A -5.2.31
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement -All work upto plinth level:-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3(1cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).SOR item No -5.3.11 BCD
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications. SOR item No -13.06 RCD
Providing 25mm thick water proof cement plaster (1:4) with clean coarse sand of F.M 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royality all complete as per building specification and direction of E/I.SOR item No -5.7.12 BCD
Providing 6mm thick C.P (1:4) in ceiling with clean coarse sand of F.M. 1.5 including screening, curimg with all leads and lifts of water, scaffolding taxes and royalty all Complete as per building Specification and direction of E/ISOR item No -5.7.6 BCD
Providing weep hole with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as per Specifications and direction of E/I.SOR item No Part A -6.7.6
Providing 1.5mm cement punning including curing, carriage of water with all leads and lifts as per building Specification and direction of E/I.SOR item No -5.7.11
Carriage of Materials - Cement
Stone Chips
Metal
Boulder
Add GST @ 18%
Add Labour Cess @1%
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TENDER-DOC-12-14.pdf
Tender Documents • 1.84 MB
BOQ_145692.xls
BOQ • 0.31 MB
SPECIAL-CONDITION.pdf
Additional Documents • 0.30 MB
Download all tender documents and submit your bid